100% Pure Polyurea Spray Polyurea for Waterproof Floor Anti-Corrosion

Price $6.00 Compare
Min Order 430 kg
Shipping From Shandong, China
Popularity 318 people viewed
Quantity
+-
 

SHANDONG CENTURY UNION NEW MATERIALS TECHNOLOGY CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
SPUA II
Liquid
Pure Polyurea
Spray
Finish Coat
Air Drying
ISO14001, RoHS, ISO9001
Film Forming Matter
Conversion Type
Roofing and Waterproofing
Liquid
1.2mm
Outdoor, Indoor
Polyurethane
ON THE WAY
Standard Export Package
A 220kgs B210kgs
Shandong China
3909500000
Product Description
Product Description

Spray polyurea waterproof coating is a spray type two components elastic coating composed of components A and B. Component A is a semi prepolymer prepared by the reaction of isocyanate with oligomer Diol or ternary alcohol, and component B is composed of amino terminated resin, hydroxyl terminated resin, amine chain extender, pigment and additives. Elastic polyurea material formed through on-site spraying with professional equipment. This product has excellent mechanical properties, medium resistance, outdoor aging resistance, and excellent adhesion.

Product Parameters
1) Rapid curing, capable of continuous spraying and forming on any curve, facade,or top surface without sagging.
2) It has excellent waterproof performance to effectively protect the substrate from water
3)Excellent physical and chemical properties, with good adhesion to various substrates.
4)Convenient construction, extremely efficient, and can meet the design thickness requirements in one construction.
5)Overall film formation, dense and seamless coating.
6)Mechanized construction is adopted, which is professional, convenient, andm controllable.
7)Free from solvents, heavy metals, and environmentally friendly.
8)100% solid, free of VOC (volatile organic compounds), environmentally friendly.
9)Wide temperature range for use (-45 ºC~150 ºC).
10)Continuous, dense, seamless coating, beautiful and practical.
Technical Data
Serial  NumberTest itemTechnical RequirementTest Result
1Solid Content %≥9898
2Gel time /s≤4516
3Surface dry time /s≤12020
4Tensile strength /Mpa≥16.022
5Elongation at Break /%≥450460
6Tear strength /(N/mm)≥5066
7Low temperature bending/ºC≤-40-40
8Impermeability0.4Mp,impermeable for 2 hoursImpermeable
9Heating elongation /%Elongation or contraction ≤1.00.4
10Bond strength /Mpa≥2.53
11Water absorption≤5.00.5
12Heat aging artificial weatheringNo cracks or deformationNo cracks or deformation
13 Heat treatmentTensile strength retention rate /%80-15097
Elongation at break/%≥400411
Low temperature
bending/ºC
≤-35-35 No cracks
14Alkali treatmentTensile strength retention rate/%80-150103
Elongation at break/%≥400413
Low temperature
bending/ºC
≤-35-35 No cracks
15 AcidationTensile strength retention rate/%80-15099
Elongation at break/%≥400410
Low temperature
bending/ºC
≤-35-35 No cracks
16SaltingTensile strength retention rate/%
 
80-150
 
97

 
Elongation at break/%≥400409
Low temperature
bending/ºC
≤-35-35 No cracks
17 Artificial weatheringTensile strength retention rate/%80-150

 
83
Elongation at break/%≥400408
Low temperature
bending/ºC
≤-35-35 No cracks
18Hardness/shore A≥8085
19Wear≤301
20Resistance/((750g/500r)/mg) Impact resistance/(k·m)≥1.01.0kg · m
without damage
Application

1)Workshop floors, storage tanks, neutralization tanks, drainage ditches, etc. In chemical, petroleum, petrochemical and other industries;
2)Structures such as landfills, sewage treatment ponds, and exhaust gas filtration towers;
3)The anti-corrosion and wear-resistant protection of the production workshop and warehouse floors;
4)Steel structure platforms such as metal pipelines, bridges, ship decks, etc.
5)Roof waterproofing, exterior wall waterproofing, and exterior wall repair as new.
6)Sports stands, anti-seepage, wear-resistant flooring.
7)Water parks, swimming pools, and aquatic products.

Packaging & Shipping
 

A 220kgs/drum B 210kgs/drum

Storage

Sealed and stored in dry, cool, and well ventilated conditions, avoid exposure to sunlight and rain, and keep away from ignition sources. Under the original packaging state and specified storage conditions, the product has a shelf life of 6 months from the production date. If the storage period exceeds, inspection can be carried out according to the items specified in this product standard. If it meets the technical requirements, it can still be used. Please use it as soon as possible after opening, and it must be resealed and stored when not in use. This product does not contain organic solvents and can be transported as a non hazardous material. During transportation, rain and sunlight should be strictly prohibited to avoid severe collisions. Materials should be neatly and stably stacked, and should comply with relevant regulations of the transportation department.

Construction Conditions

Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
Environmental temperature and humidity requirements: The construction environment temperature should be between 5~35 ºC, and the base surface temperature should be at least 5 ºC higher than the air dew point temperature; The humidity range should be between 30% and 80%. Ventilation conditions: Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

Operation Methods Requirements

Base surface requirements: The concrete base surface should be cleaned, repaired flat, and polished to a certain roughness. Ensure that the concrete curing is completed, the strength reaches C25 or above, and the moisture content is less than 8%. After processing the base surface, the next process should be carried out as soon as possible.
Environmental temperature and humidity requirements: The construction environment temperature should be between 5~35 ºC, and the base surface temperature should be at least 5 ºC higher than the air dew point temperature; The humidity range should be between 30% and 80%. Ventilation conditions: Ventilation should be maintained during construction, but construction should not be carried out when there is strong wind.

Mix component B of the coating evenly before use A: B=1:1 (volume ratio) Professional construction teams must use professional spraying equipment for construction, and the material temperature during spraying should be controlled between 50~80 ºC.
In general, the next process can be carried out after 12 hours of painting. If the construction interval exceeds 24 hours, a layer of interface agent needs to be applied before construction can proceed. If encountering adverse weather such as rain after coating, a layer of interface agent must be applied before proceeding to the next process.
Under normal circumstances, the paint film should be cured for at least 7 days after completion of painting to ensure the best performance of the paint film.

Suggested Use QTY
1.2kg/mm/m2,
waterproof national standard thickness 1.5mm, single square meter  dosage 1.8kg,
anti-corrosion national standard thickness 2.0mm, dosage 2.4kg.

Construction steps:

 
FAQ

1. What products does your company specialize in?
We specialize in plastic running track materials and polyurea products. Our running track materials, made from high-quality PU and EPDM rubber, are durable, elastic, and eco-friendly, ideal for sports fields and schools. We also offer spray polyurea, brushable polyurea, self-leveling polyurea, and polyaspartic coatings for waterproofing, flooring, and corrosion protection.

2. Do you offer customized solutions?
Yes, we provide customized formulations and construction solutions tailored to meet specific project requirements.

3. Are your products environmentally friendly?
Absolutely. All our products comply with international environmental standards, using eco-friendly raw materials that are non-toxic and pollution-free.

4. What are the main applications of polyurea?
Polyurea is ideal for roofing waterproofing, industrial equipment anti-corrosion, tunnel lining, sewage tanks, and parking lots. It provides excellent durability, waterproofing, and corrosion resistance.

5. What is the difference between brushable and spray polyurea?
Brushable polyurea is designed for small or intricate areas, offering easy application. Spray polyurea is better suited for large areas, ensuring high efficiency and uniform coatings.

6. Can your polyurea withstand extreme temperatures?
Yes, our polyurea products perform well under extreme conditions, maintaining stability from -40°C to 120°C.

7. Do your products resist chemical corrosion?
Yes, our polyurea has strong resistance to acids, alkalis, and salts, making it suitable for chemical plants, wastewater treatment facilities, and other harsh environments.

8. How long does the coating last after application?
When applied and maintained correctly, our polyurea coatings can last over 20 years.

9. Do you provide technical support for application?
Yes, we offer comprehensive technical support, including training, on-site guidance, and optimized solutions for your projects.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA