Fully Automatic Hot Water Boiler with Siemens Control

Price $60000.00 Compare
Min Order 1 Set
Shipping From Guangdong, China
Popularity 427 people viewed
Quantity
+-
 

Devotion Machineries Co., Limited

VIP   Audited Supplier 10 years
Profile Certified by SGS/BV
CWDR0.035~CWDR2.8
Hot Water Boiler
Electric Heating
Packaged Boiler
Electric Heating Elements
Hot Water
Forced Circulation
Horizontal Boiler
No Pressure
A
Electric Heating Elements
Industrial and Commercial
350kw - 2800kw
300,000 Kcal/Hr ~ 1,200,000 Kcal/Hr
Atmospheric Pressure (Air Pressure)
3/380/50,3/400/50
Duo-Block
Electric Heating Elements
Wooden Case
350 kw~2800kw
Guangzhou
84031090
Product Description
Boiler Applications
- 90 degree C hot water output; providing hot water for heating through radiators in cold areas;
-providing hygienic hot water through heat exchanger;
-providing hot water for industrial process;
 
Product Characteristics
-no pressure design, more safe and reliable with more competitive price;
-high efficiency more than 97%;
-clean operation environment;
-less boiler house accessories, less initial investment;
-fine quality heating elements, long life-span;
-fully automatic operation with full safety protection functions.

 
 Rated output
(kW)
Outlet/Return water temp (ºC)Power supply Weight  (kg)Electric controller
(mm)
(L×W×H)
 
Controller
quantity
Voltage (V)Power (kW)N.WWorking  weight
CWDR 0.0353590/6538036287458800 X 600 X 3001
CWDR 0.0939310863011921900 X 800 X 4601
CWDR 0.11711712664012021900 X 800 X 4601
CWDR 0.17517518065012381900 X 800 X 4601
CWDR 0.23323325294016392200 X 800 X 8001
CWDR 0.2828028887915782200 X 800 X 8001
CWDR 0.3535036092818802200 X 800 X 8001
CWDR 0.407407432154635812200 X 800 X 10001
CWDR 0.465465468154635812200 X 800 X 10001
CWDR 0.525525540153035652200 X 800 X 10001
CWDR 0.57570576153035652200 X 1000 X 10001
CWDR 0.7700702160036352200 X 800 X 10001
CWDR 0.8800810170947092200 X 1000 X 10001
CWDR 0.9900918177150942200 X 1000 X 10001
CWDR 1.0510501080204256882200 X 1000 X 10001
CWDR 1.1711701188209860682200 X 800 X 8002
CWDR 1.414001404227268882200 X 800 X 8002
CWDR 1.7517501782294375002200 X 800 X 8003
CWDR 2.121002106321785162200 X 800 X 8003
CWDR 2.4524502484358097302200 X 800 X 8004
CWDR 2.8278528084130112002200 X 800 X 8004


FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.

Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA