100m3/H Water Electrolysis Hydrogen Power Electricity Generator for Hydrogen Gas Generation Plant

Price $50000.00 Compare
Min Order 1 Piece
Shipping From Jiangsu, China
Popularity 326 people viewed
Quantity
+-
 

Suzhou VMA New Energy Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
VMP-100
New Energy
ISO, CE
New
Low
Gas Tank
Gas Manufacturing
0.5-300nm3/H
4lpm
up to 3.2MPa
99.9999% (After Purification)
40-60 Deg.C
80000+H
Hydrogen, Oxygen
Medium
OEM/ODM/VMA
Wooden Case for Exportation
Customized
China
8543300090
Product Description

Product Description

PEM Water Electrolysis Electrolyzer Stack
Area750*420mm
DC4725A
Cell DCV1.8-2.5V
End Plate Size1140*635*60mm
Cell Output1890L/H
Cell Numbers30~158
Total Output60-300m3/h
Anode InletG1-1/2*2
Anode OutletG2*2
Cathode OutletG2
Inlet Pressure0-0.5MPA
Hydrogen Output Pressure0-3MPA
Cell Flow Rate4.5LPM
Operating Temperature40-60ºC

Alkaline Water Electrolysis Hydrogen Electrolyzer Stack

H2 Output Capacity 

0.5-1000Nm3/h

O2 Output Capacity

0.25-500Nm3/h

H2 Purity (Before Purification)

99.8%+/-0.2

H2 Purity (After Purificaiton)

99.9999%

O2 Purity (Before Purificaiton)

98.5%+/-0.5

H2 Dew Point

<=-65ºC

Working Load

30-100%

Working Pressure

 up to 3.2Mpa

DC Power Consumption

<=4.5Kw.h/Nm3 H2

Working Temperature

 85+/-5ºC

Utilites and Related Equipment

Water 
Alkaline Hydrogen Generator will consume some DM water, normaly 1liter of DM water per Nm3 of H2.
Because the electrolysis and H2 purification process will produce some heat, so it will also need cooling water circulation to cool the gas and system.


Power  
The electrolyzer stack use DC power, and normally the power supply should be 7time of the expected capacity of the Hydrogen Plant.

Instrument air  
For driving instruments

Our system contains Hydrogen Generator, power supply system, PLC control system; and we can also provied auxiliary equipments such as water purifier, water chiller, air compressor, ext.
 

Company Profile



PEM Hydrogen Generator

Our Advantages

Key Benefits

Packaging & Shipping

 

Waranty Period

12 months from the date of successful comissioning of the equipment or 18 months from the date of equipment delivery, whichever comes first.

Testing and Process

First Step to Have One More Choice

 

VMA is one of very few companies that offer both the expertise and the technologies to help sectors that are difficult to reduce carbon emissions and enterprises who want to embark on green energy futures. Our green Hydrogen solutions will power a sustainable future.

Tell us about your project plans or just say hello. Whether you've got a big idea or need some inspiration with a green hydrogen plant construction project, we are here to create perfect green hydrogen plants. From concept to creation, let us inspire you.

                      Towards 100% New Energy, Let's Connect!

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA