WSZ
Aerators
Combined Treatment
Industrial, Home, Agriculture, Hospital
Integrated
Customized
24-Hour Automatic Operation
0.5-30t/H
BETTER
Seaworthy Package
carbon steel
China
Product Description

- Disposal of sewage from life and industry is a difficult and costly problem,As a result, we are seeking new solutions to address these pain points to reduce costs and risks and improve operational performance.
- WSZ Series Sewage Treatment Equipment will be one of your best choices.
- Advantage: compact design, small area, low cost, reliable operation, high automation as well as simple maintenance while discards defects in traditional sewage treatment technology



- WSZ treat wastewater in batches within the same vessel. This means that the bioreactor and final clarifier are not separated in only space but also in a timed sequence. The installation consists of at least two identically equipped tanks with a common inlet, which can be alternated between them. While one tank is in settle/decant mode the other is aerating and filling.
- This is the new biological processes that used to remove contaminants and produce treated wastewater (or treated effluent) that is safe enough for release into the environment.

- activated sludge+ Suspended Biofilm process
- Activated sludge/ biofilm process represents a renewable process with the combination of activated sludge process and biofilm process. The activated sludge is not easy to be carried away by the water.
- It is concluded that the combined activated sludge/ biofilm process has better resistance to shock loads, high nitrogen removal efficiency and consistent effluent quality.
- Product Information
Technical Parameter Model 0.5 1 3 5 10 20 30 Capacity (m3/h) 0.5 1 3 5 10 20 30 Air blower Model HB-0.75 HB-1.1 HB-1.2 HB-4.4 HB-8.8 HB-11.5 Power 0.75 1.1 1.2 4.4 4.4*2 11.5 Pump Model 40QW-10-0.75 40QW-10-7-0.75 50QW10-10-1.1 50QW25-7-1.5 50QW25-7-1.5 50QW42-9-2.2 Power 0.75-1.1 1.5 2.2 Inlet water BOD5
mg/L150-400 Outlet water BOD5
mg/L20-60 Floor space 4.5 6.5 12 15 35 51 76
- WSZ is a multi-chamber reactor unit that makes use of highly concentrated microorganisms to degrade organics and remove nutrients from wastewater to produce a high-quality effluent. To maintain aerobic conditions and to keep the activated sludge suspended, a continuous and well-timed supply of oxygen is required.
- if Oxygen is prevented from reaching the water, allowing anaerobic bacteria to grow, which can cause health concerns, emit foul odors. So we added a lot of aerators to produce oxygen, which can quickly treat organic matter.

- The best way to install the equipment is underground.
- The WSZ's process is appropriate in almost every climate. However, treatment capacity is reduced in colder environments.
- Biological oxidation processes are sensitive to temperature and, between 0 °C and 40 °C, the rate of biological reactions increase with temperature. Most surface aerated vessels operate at between 4 °C and 32 °C.





13 Years of Experience
- With decades of knowledge in this sector, our water treatment equipment is designed for cater for the specialized requirements of industry and life during the internal waste management processes
BETTER manufactures water treatment equipment for a number of different industries, and we specialize in designing reliable device for the hospital, food, energy and marine industries. Our trained engineers have many years of experience, thus we are able to offer custom-made equipment for a wide variety of sectors with very different needs.We're focused on new and innovative solutions for our equipment and are committed to helping our customers solve different problem.

FAQ
Q:How to buy your idea products?
A:Professional engineers design projects for you after you provide us your water sources, water quality,water quantity, water after requirement (connect us for more details).
Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
Q:How to pack the products?
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by
customers.
Q:How to keep your equipment from corrosion?
A:We use the world-famous paint, like Sigma Coating,Pain Bow,etc. What's more, we paint strictly according to the standard process.
Q:How to install after the equipment arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.