L0140
Online Technical Support
2 Years
TUV, ISO9001, ROHS, CE
Water Heating Systems
Brass
Hotel, Home,Office, Bedroom
Floor Heating Systems
Brass Color
1 Set Underfloor Heating Mixing Unit
Modern
Pump Group Station
Graphic Design, 3D Model Design
Mixing Control Unit Pump Group Station
Lingcen/OEM Accepted
Carton or Customized Colorful Box
1"
Zhejiang, China
8481804090
Product Description


Product Details:
Product Name: | Boiler Heating System Mixing Control Unit Pump Group Station |
Threaded connection: | system side:G1"M boiler side:G11/2"F |
Outputs centre distance: | 125mm |
Max. working temperature: | 110ºC |
Working pressure: | 6bar |
Reserved length of water pump installation: | 180mm |
Thermometer range: | 0~120ºC |
Connection Thread: | ISO 228-1 standard |
Customized Support: | OEM, ODM |
Supply Ability: | 50000 Pieces per Month |
Application:
Suitable for heating and cooling systems, it works in conjunction with manifolds to achieve secondary circulation and control in the secondary heating or cooling system.
Advantages:
The direct circulation pump station integrates an efficient and energy-saving variable frequency pump, supply and return water temperature sensors, and a check valve. It is also equipped with an insulation shell, making installation and commissioning simple.





Welcome to ask any question about our products.



A: We are direct factory and trading company, our production line includes brass, stainless steel products or according to your requirements.
Q2. Do you have any MOQ limit for valve order?
A: Low MOQ.1pc for sample checking is available.
Q3. Is the sample free or extra?
A: We could offer the sample for free if you could pay the cost of freight.
Q4. How long is your delivery time?
A: Generally it is 10-15 days if the goods are ready to ship. Otherwise it is 35-40 days.
Q5. What is your terms of payment ?
A: 30% T/T in advance ,balance before shipment.
lf you have another question, pls feel free to contact us directly.