IP-02T
Normal
Desktop
Plastic
RoHS, LFGB, SASO
No Cold
0
0
0
/
/
0
0
OEM
OEM
10 Pieces in One Box
7.5kgs
Ispuring
Standard Export Carton Box
25*25*27cm
Zhejiang
8516791000
Product Description
Product paramaters:
Payment:
Photos:
Model Number | IP-02T |
Heating Power/Capacity | / |
Cooling Power/Capacity | / |
/ | |
Related Voltage/Frequence | / |
/ | |
Body materials | PP |
100% new ABS plastic | |
Compressor Brand | / |
Compressor Warranty | / |
Plastic parts Warranty | 1 year |
Water Tank Type | / |
/ | |
Water Tank Material | / |
Connection Type | / |
/ | |
Hot Tank Volume | / |
Cold Tank Volume | / |
Refrigerator Volume | / |
Cabinet Volume | / |
Color | OEM |
Brand | OEM |
Packing Material | Standard export color box |
G.W./N.W. | / |
Product Sze | 25*25*27cm |
Packing Size | 80*24*45cm ( 10pcs in one box) |
20'ft container | 3500pcs |
40'HQ container | 8300pcs |
Payment:
Payment method | 100% T/T (30% deposit and 70% balance should be paid before container loading or against copy of B/L ) |
Irrevocable L/C at sight | |
Production time | 25-30days after deposit received |
Photos:





Package:

FAQ
Q: What is the difference between Electronic cooling system and Compressor cooling system?
A: 1. The compressor type is cooled by refrigerant R134a, Cooling Power: 90W, Cooling Temperature: 6-10°C, Cooling capacity: 2L/H
2. The electronic type is cooled by electronic semiconductor, Cooling Power: 75W, Cooling Temperature: ≤15°C, Cooling capacity: 0.75L/H
So, compressor cooling type is faster, colder and more stable than electronic cooling type.
Q: What is the production time?
A: 25-30 days after deposit received.
Q: Can I put my own Logo on machine?
A: Yes, we are specializing in OEM order. Logo, carton design, color are all can be customizable.
Q: What is MOQ?
A: 120pcs for compressor cooling system, 280pcs for electronic cooling system.
Q: What is the guarantee term for product?
A: Compressor 3 years, Plastic parts 1 year and offer 1% of total order quantity spare parts for FREE CHARGE!
Q: What is the payment term?
A: 30-40% deposit and balance should be paid before container load.





