XK-400
After Sale Free Parts, Training and Adjust
Two Year
CE, ISO
New
Customized
Automatic
Horizontal
400mm
1000mm
18.65m/Min
1:1.27
10mm
18-35kg
37kw
Based on Customer Request
EVERTECH
Sea Standard Package
4350x1850x1785mm
China
84778000
Product Description
Rolling Bearing Bush Two Roll Rubber Mixing Mill Machine - Mixing Mill Machine
Structure:
This machine is mainly has one based, frame, front and rear drum, gear, reducer, distance adjusting device, roller temperature adjusting device, a safety switch, an electric control system.
Alloy chilled cast iron roller material, having high hardness and wear resistance, roller temperature adjusting device, to the cylinder is filled with steam or cooling water or regulate the temperature of the roller, to meet the process requirements.







Open rubber mixing mill is mainly used for cooking, rubber sheeting, gel breaking, plasticating and mixing.
Structure:
This machine is mainly has one based, frame, front and rear drum, gear, reducer, distance adjusting device, roller temperature adjusting device, a safety switch, an electric control system.
Alloy chilled cast iron roller material, having high hardness and wear resistance, roller temperature adjusting device, to the cylinder is filled with steam or cooling water or regulate the temperature of the roller, to meet the process requirements.




Type | XK-160 | XK-230 | XK-250 | XK-300 | XK-360 | XK-400 | XK-450 | XK-560 | XK-550B |
Diameter of roll(mm) | 160 | 230 | 250 | 300 | 360 | 400 | 450 | 560/510 | 550 |
Length of roll(mm) | 320 | 600 | 620 | 750 | 900 | 1000 | 1200 | 1530 | 1500 |
Line speed of front roll(m/min) | 8.95 | 10.21 | 14.1 | 15.1 | 16.25 | 18.65 | 24.26 | 27.72 | 27.94 |
Speed ratio of roll | 1:1.35 | 1:1.19 | 1:1.17 | 1:1.25 | 1:1.25 | 1:1.27 | 1:1.27 | 1:1.2 | 1:1.22 |
Max roller spacing(mm) | 4 | 7 | 8 | 10 | 10 | 10 | 15 | 15 | 15 |
Capacity per. Batch(kg) | 1-2 | 6-10 | 8-15 | 15-20 | 20-25 | 18-35 | 25-50 | 35-50 | 50-60 |
Driving motor power(kw) | 5.5 | 15 | 18.5 | 22 | 30 | 37 | 55 | 90 | 110 |
Overall size(mm) | 1380*860*1320 | 2800*1200*1120 | 3400*1500*1120 | 3450*1500*1500 | 3780*1850*1750 | 4350*1850*1785 | 5200*2380*1840 | 5480*2284*1978 | 5870*2284*1978 |



Qingdao Evertech Industry Co., Ltd We are the sister company with Taixing Reshine Rubber&Plastic Machinery Co., Ltd ,Ningbo Dechuan Machinery Co., Ltd and Wuxi Zhenxing Machine Co.,having more than 10 years of experience in the field of rubber&plastic machineries, owning 5 manufacturing plants, mostly are located within the scope of 300 KM around Shanghai, having dozens of experienced engineers and more than 100 skilled workers, as well as a considerable number of precise, digital-control, advanced processing machine tools. All ensure every part and details of our machines with good performance and qualified running test before delivery to our customers on time.
Our main products include: Dispersion Kneader,Banbury Mixer,Two Roll Open Mixing Mill,Rubber Precision Preformer (Barwell),Rubber Calender,Hydraulic Vulcanzing Press,Rubber Extruder,Rubber Filtering Machine,Single Screw Extruder and Twin Screw Extruder for Compound Pelletizing,Sigma Kneader,Bandknife Splitting Machine for EVA/PE/EPDM/CR/RUBER CORK,Rubber Crusher Mill and Rubber Refining Mill for Reclaimed Rubber,Rubber Cutting Machine,Cooling Machine,etc.




1.What are the payment terms?
TT,L/C and trade assurance are acceptable,TT will be more appreciated,30% deposit before production,70% balance before shipment.
2.What is the delivery time?
At least 1 month after the deposit recipit,depend on how many machines included in the line.
3.How to pack the machine?
Standard packaging
4.How to install after the machines arriving destination?
Our engineer will go to customers site if you need,but need to pay installation fee accord with the contract.
5.What's the capacity you can do?
We always produce depend on customers' requirement.
TT,L/C and trade assurance are acceptable,TT will be more appreciated,30% deposit before production,70% balance before shipment.
2.What is the delivery time?
At least 1 month after the deposit recipit,depend on how many machines included in the line.
3.How to pack the machine?
Standard packaging
4.How to install after the machines arriving destination?
Our engineer will go to customers site if you need,but need to pay installation fee accord with the contract.
5.What's the capacity you can do?
We always produce depend on customers' requirement.
Welcome to send me email any time.