MPCVD single crystal diamond deposition equipment for laboratory
Application
Preparation of high-quality single crystal diamond, Diamond Grown;
Preparation of high-quality polycrystalline free-standing diamond films;
Preparation of high quality polycrystalline diamond films;
Preparation of various carbon nano films such as graphene, carbon nanotubes, fullerenes and diamond films.
Features:
a. Stainless steel cavity type 10kw microwave plasma equipment, high power density;
b. The water-cooled substrate stage and the water-cooled metal chamber ensure the system can work stably for a long time;
c. The substrate temperature is achieved by microwave plasma self-heating;
d. The vacuum measuring instrument adopts a full-range vacuum gauge, which can accurately measure the background vacuum and working gas pressure;
e. The vacuum pump and valve adopt turbo molecular pump (the ultimate vacuum is 1×10-5Pa) and the rotary vane mechanical vacuum pump (the ultimate vacuum is 1Pa), and the system can automatically control the deposition pressure;
f. Cooling water circulation system to ensure long-term safe and stable operation of the device under high power;
g. 15-inch touch screen, PLC automatic control, can set the temperature or pressure to be constant, can save and reuse up to 20 sets of process files;
H. Fully automatic process control module, which can stably and reliably prepare high-quality diamond films and crystals.
Advantages:
1) High production efficiency, large output, high quality, 72 pieces of diamonds of 7x7x4.3 can be installed at one time. It can produce about 280 ~360 carats rough diamonds per furnace.
2) The equipment has reached industrial production. The molybdenum stage is 85mm large, with fast growth speed, high yield rate and good stability.The precision and quality of the processed components are extremely high, and the processing quality of our equipment is quite exquisite.
3) The equipment is currently the first main equipment at home and abroad that can achieve industrialized production of single crystal diamond. Equipped with advanced production technology to ensure customers produce qualified products.The clarity can reach vs,vvs. The color can reach D,E,F,G level according to customers' requirements.
Item | model | Quantity (set / piece) | manufacturer or origin | note |
microwave source | 10kW / 2450 MHz | 1 | domestic | |
microwave transmission system | Mixer MPT-2012waveguide | 1 | domestic | |
mode converter | MPM-2050 | 1 | domestic | |
microwave reaction cavity | Downstream MPP-2050 | 1 | domestic | |
sample table and bracket system | N / A | 1 | domestic | Water cooling, one layer lifting |
gas flow system | 5 gas mass flow controller: H2, CH4, O2, N2, Ar | 5 | Japan | |
gas vacuum valve and filter | 1 set | Japan | ||
Gas system connection components | 1 set | Japan | ||
vacuum system | vacuum valve and filter | 1 | Japan | |
vacuum cavity, vacuum tube | 1 | domestic | ||
mechanical pump and vacuum valve | 1 | domestic | ||
molecular pump and supporting vacuum valve | domestic | |||
measure | resistance vacuum meter | 1 | domestic | |
film vacuum meter | 1 | domestic | ||
infrared thermometer | 1 | domestic | ||
electric control system | PLC | 1 | Germany | |
touch screen | 1 | domestic | ||
water cooling system | cooling water temperature, flow monitoring | 3 | Japan | |
Control box / cabinet | 1 | domestic | ||
voltage stabilizing power supply | Requires user configuration | |||
circulation chiller | Requires user configuration | |||
gas cylinder, stainless steel gas pipe, water pipe, power distribution, exhaust pipe | Requires user installation |
Equipments Photos:











Q. Are you a manufacturer or a trading company?
Q. How is your company's product after-sales service system?
A. The product warranty period is 12 months, we can provide lifetime maintenance. We have professional pre-sales and after-sales departments that can respond to you within 24 hours to resolve any technical issues.
Q. How long is your delivery time? If I want to customize the instrument, how long does it take?
A.1. If the goods are in stock, it is 5-10 days. 2. We can provide customized services for our customers. Which usually takes 30-60 days depending on the specifications of the custom instrument.
Q. Our country's power supply and plug are different. How do you solve it?
A. We can supply a transformer and plug according to your local requirements according to the power plug of different countries.
Q. How to pay?
A.T / T, L / C, D / P, etc., it is recommended to use Made in China Trade Guarantee.
Q. How is the package of goods? Delivery methods?
A.1. Standard export fumigation sign wooden box packaging 2. Express, air, sea shipping according to customer requirements to find the most suitable way.
More questions, please FEEL FREE to contact me.