pe2001
ANSI, DIN, GB
Welding Flange
Plastic
Flanges
Flanged
Forging
Water Supply/Gas Distribution/Mining/
SDR7.4-SDR33
CNC Machining
Stub End/Flange Adaptor
Smooth Surface
Butt Fusion
Jubo
as Your Request
DN15-800MM
Jiangxi, China
Product Description
JuBo High Pressure PN25 PN20 HDPE Stub End Flange Adaptor DN20-DN2000 PE Pipe Fittings







FAQ.
A: We are confident in our products,and we pack them very well.So usually you will receive your order in good condition.Any quality issue,we will deal with it immediately.
6.QHow can you guarantee the production quality ?
A:Our production quality follows ROHS,Halogen Free,We have 20 years experience of QC team. We have strictly quality control system in our production process. We have 4 times inspection for each finished product before package Third part inspection acceptable.

Specification:
Product Name | flange adapter, stub end |
standard | ISO4427 |
Material | HDPE |
Size range | DN50 to DN1200 |
working pressure 1 | SDR17, SDR13.6, SDR11 |
working pressure 2 | PN10, PN12.5, PN16 |
working pressure 3 | 1.0MPa, 1.25Mpa, 1.6MPa |
connection method | socket fusion,butt fusion |







1.Q: May I have samples?
A: Yes, Free sample available
You can provide us detailed specification or send sample to us directly.Customed design also avaiable.
2.Q: Can I use our own designed package?
A: Yes, size, color, logo and packaging style of product are customized.
3.Q: When's your delivery time?
A: Generally, 3-5days for samples, 15 days for mass production.
4.Q: What's your payment terms?
A: T/T ,D/A,D/P,L/C in advance, Paypal,Western Union, etc.
5.Q:How about the quality guarantee period?A: We are confident in our products,and we pack them very well.So usually you will receive your order in good condition.Any quality issue,we will deal with it immediately.
6.QHow can you guarantee the production quality ?
A:Our production quality follows ROHS,Halogen Free,We have 20 years experience of QC team. We have strictly quality control system in our production process. We have 4 times inspection for each finished product before package Third part inspection acceptable.