Steel Formwork System for Bridge Construction

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 462 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our Steel Formwork System is designed for exceptional durability and reusability, making it ideal for multiple construction projects. This system is not only easy to assemble and erect, but also maintains a fixed shape and structure. It is perfectly suited for large-scale projects requiring uniform shapes, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. The total net weight of a fully loaded container typically ranges from 22 to 25 tons, which should be confirmed prior to loading.
2. We utilize various packaging methods to accommodate different products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are placed in bags and then organized on pallets.
---Wooden cases: Available upon customer's request for specific needs.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container order, we generally require 20-30 days after the customer's down payment is received.
2. Transportation: Delivery time varies based on the destination charge port.
3. Special requirements will be accommodated through negotiation.

FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil manufacturing company with two dedicated factories.

Q2: What are your primary services?
A: We specialize in designing and manufacturing formwork products forbridge and tunnel construction.

Q3: How can you assist us?
A: We provide comprehensive suggestions, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We supply our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We offer exceptional formwork products to our global peer companies.

Q4: How long does it take to provide a brief design and quotation after receiving the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Generally, production requires 30~60 days, based on the type and quantity of the required products.

Q6: What are your payment terms?
A: We require a 30% T/T advance payment, with the remaining balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA