Jf-Fa Auto Splicer Corrugation Machine Paper Splicer with Working Width 1800mm

Price $12000.00 Compare
Min Order 1 Piece
Shipping From Tianjin, China
Popularity 265 people viewed
Quantity
+-
 

Tianjin Zhono Import & Export Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
JF-FA
Engineer Guides, Debugs and Video Instruction
3 Years
New
ISO 9001:2008, GB/T19001-2008
Automatic
Recycled Material, Paper
Normal Specification Paper
1200-2800
200m/Min
150m/Min
1s
Ding Hao
Film Wrapping, Oiled and Tray;
Tungsten Carbide
Dongguang County, Cangzhou City, Hebei, Chine
8441309000
Product Description
Product Description
  • Designed with PLC control system and man-machine interface for operating.
  • Features success rate of paper splicing above 99%.
  • Comes with magnetic power clutch for auto control.
  • With buffer roller for chain walking transmission.
  • Achieves zero-edge splicing only with 3mm gluing edge between new and old paper.
  • Paper clipping bar and teeth cutting knife integrated for splicing and cutting at one step.
  • Its simple structure gives easy and fast installation over new or old machines.
  • Most are in pneumatic control with low power consumption.
  • It is in good use for easy splicing at economic price, which can be finished within 40 seconds.
Product Parameters
Working Width1200-2800mm
Splicing Speed150m/min
Speed with Line200m/min

 
Packaging & Shipping

Equipments are wrapped with plastic film and oiled for preventing rust when shipping.
We also provide a detailed list which shows how container stores equipments s
o it can be clearly coordinated on arrival to the customers factory for unloading in the correct sequence.

  

 

FAQ

1. Are you manufacturer or trading company?
We a combination of manufacturer and trading company.

2. What is the payment term you accept? 
We usually accept T/T. DP and LC are also ok for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.

3. What is your leading time in average? How much time needs for installation?
The manufacturing period for production line is 150 days since deposit is received and installation period is around 30 days.


4. How do we install and debug machine?
Engineer guides installation and debug machine via video or on site.

5. Where is factory? How can we visit there?
Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near to Beijing and Tianjin, so after you get Beijing or Tianjin airport, we will pick you up to factory.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA