ALL size
Good After Sales Service
6months
New
ISO9001
Non-Customized
Alloy
Metal Recycling Machine, Metal Cutting Machine
0.2-3.2mm
PVD, CVD, Double Coating
Ar.Am, GM, Dm, Df, etc
Cnmg, Tnmg, Ccgt, Cmmg, Txct, Anmt
7-30days
Top Quality
WAHEYNAO
10PCS Standard Box
120608
China
8208101100
Product Description
Factory supply K10 Tungsten carbide brazing tips from zhuzhou
Feature:
- 100% virgin raw material of WC+CO
- Wholesale price and High stable quality
- ISO standard
- OEM & ODM Service
- Application: Turning, milling, threading and parting etc. For finishing, semi-finishing, light roughing and roughing steel, casting steel, alloy steel, cast iron, stainless steel and so on.
- Outstanding characteristic: good cutting quality ,higher wearing resistance and longer use lifetime.
- Customized type: we can produce the carbide blade as customer's drawing,size and requirement.
Grade Information of Tungsten carbide brazed tips
Grades | ISO Code | Physical and mechanical properties | ||
Density | Hardness | TRS | ||
YG3X | K05 | 15.0-15.4 | 91.5 | 1180 |
YG3 | K05 | 15.0-15.4 | 90.5 | 1180 |
YG6X | K10 | 14.8-15.1 | 91 | 1420 |
YG6A | K10 | 14.7-15.1 | 91.5 | 1370 |
YG6 | K20 | 14.7-15.1 | 89.5 | 1520 |
YG8N | K20 | 14.5-14.9 | 89.5 | 1500 |
YG8 | K20 | 14.5-14.9 | 89 | 1670 |
YW1 | M10 | 12.7-13.5 | 91.5 | 1180 |
YW2 | M20 | 12.5-13.2 | 90.5 | 1350 |
YS8 | M05 | 13.9-14.2 | 92.5 | 1620 |
YT5 | P30 | 12.5-13.2 | 89.5 | 1430 |
YT15 | P10 | 11.1-11.6 | 91 | 1180 |
YT14 | P20 | 11.2-11.8 | 90.5 | 1270 |
YS25 | P20 | 12.8-13.2 | 90.5 | 1620 |
YS30 | P25/P30 | 12.4 | 91 | 1715 |
YC45 | P40/P50 | 12.5-12.9 | 90 | 2000 |
YS2T | YG10HT | 14.3-14.6 | 91.5 | 1800 |






1) When can I get the price?
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in
your email so that we will regard your inquiry priority.
2) How can I get a sample to check your quality?
After price comfirmed, you can place an small trial order to test, but if you need only 1-2 pcs, we can send the free to you, and
you need to pay the shipping cost, please noted.
3) How long does the whole procedure being worked out?
After you place a order,the production handling time is about 25-30 days.
4) What about the transportation and delivery date?
Normally, we use the DHL, TNT, UPS, FeDEx to send the goods, the shipping time around 5-7 days can be reach in your local