second hand beer brewery equipment to 400 l set for manufacturing plant


Name | Steam Heating SUS304 2 Vessels 1000L Cassman Beer Brewing Equipment |
Grain Miller | Miller with double roller |
Brewhouse System | Including Mash Tun,Lauter tun, Kettle Tun and Whirlpool tank; Heating way: Electricity heating,direct fire heating or steam heating; With grain rake, false bottom, spray ball etc; |
Fermenter | Fermentation tanks (the capacity is based on the brew batch; the quantity is based on the production); Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe;8.Spunding valve |
Glycol cooling unit | Glycol water tank, Cold water tank,Refrigeration chiller Machine; |
CIP cart | Sterilization Tank ,Caustic tank,Hot water tank Thickness is 2mm; Weld slinging band; Valves, accessories supporting;All welding are argon protection single-sided,double-sided forming; Function:Clean in place for tanks |
Control panel | PID semi-auto controller, PLC auto controller, brand is Siemens, LG for optional.Electric components have CE Certificate. |
Filter Unit | Kieselguhr filter, Membrane filter; Filtered beer tanks/bright beer tank; In restaurant, beers are always served as craft beer without filtration. |
Filling system | Keg filling and washing Machine; Bottle capping and filling Machine. Keg filling and washing Machine; Bottle capping and filling Machine. |
Other facilities | steam boiler, steam pipe,all the pipes for brewhouse unit and glycol cooling unit and so on . |
1----Mill System
1. Malt Mill Material: Stainless Stell carbon steel;
2. Speed differencial Double roller type malt mill machine;
3. Equipped with motor, belt pulley, belts, etc;
4. Crushing Particle Size: Adjustable
5. Ratio of Magnetic Metal Material:≤0.003g/kg
6.Temperature of Rollers after Production:≤56ºC
Working capacity, power and dimension is decided according to mashing system.
Flexible auger and grain hopper is optional
2----Brew House System
1. Mash tun, Lauter tun, Kettle tun, Whirlpool tun in various combination Two vessel/Three vessel /Four vessel
2. Hot water tank and cold water tank for optional in special combinations
3. Infusion or decoction brewing methods are designed as request
4. Stainless steel or Red copper are popular
5. Two stages or single stage heat exchanger for wort cooling
6. Completely stainless steel integrated work platform
7. Sanitary and efficiency wort pump
8. All pipings and fittings
3----Fermenter System
1. Capacity: 100L-30000L, 1bbl-100bbl, +25% Head space
2. Interior shell thickness 3-6mm, Exterior shell=2mm
3. 100% TIG welding with pure argon gas shield
4. Interior finish: pickled and passivated, external polished, 80mm insulated
5. Test pressure 3 bar, working pressure 1.5 bar
6. Glycol zones (Both on side and concial/bottom)
7. 60°conical bottom for Fermener, Shadow less side man way
8. Racking arm, Sample valve, Pressure relief valve on the top, Dry hopping on the top
9. Mechanical relief valve 3 bar on CIP arm with pressure gauge
10.Adjustable tank leveling pads
4----Bright Beer tank System
1.Standard stainless steel bright tanks for beer maturation, conditioning, service, carbonation
2. Single size as fermenter is common used in restaurant or bar
3.Tanks quantity is exactly calculated for various beers and the function
4. All manhole, valves, stone, gauges, fittings etc are included
5----Cooling System
Glycol water supply for wort cooling and fermentation cooling.Its structure usually include Glycol water tun+1 or 2 chillers(the cold liquor tun is optional).
Usually for the large beer system,we suggest with chiller+glycol water tank+cold water tank for the glycol cooling system.The smaller beer system with chiller +glycol water tank.
1.Insulated glycol water tank with or without copper coil for glycol liquid holding and mixing
2. Efficiency chillers or refrigerators with fryonto supply cooling energy
3. Sanitary centrifugal pump for glycol water recycle among tanks and heat exchanger
4. All pipes, fitting, insulation materials are included
6----Control System
1. Electricity controlling cabinet with temperature, on-off controlling for brewhouse
2. Electricity controlling cabinet with temperature, on-off controlling for fermentation unit
3. Temperature controller, thermocouple, solenoid valves etc are included
4. PLC with touch screen panel for special request
7--CIP System
Caustic Tank:
1. Material is SUS304;
2. Thickness is 2mm;
3.Interior Finish Polish: 0.2~0.4 μm
Sterilization Tank:
1.Material is SUS304;
2.Thickness is 2mm;
3.Interior Finish Polish: 0.2~0.4 μm
Equipment warranty includes tank warranty, electric parts warranty, auxiliary parts warranty, etc.
1, Cassman provides 3-5 years warranty for the main tank, 1 year warranty for electrical components and auxiliary parts, etc., and lifetime after-sales service.
2, In order to ensure the normal operation of the brewery, we can provide a separate set of spare parts according to the customer's request, customers can replace parts in case of abrasion damage.
Maintenance:
During operation, daily maintenance for the equipment is important. Cassman will provide maintenance guide., if need, we can send engineer to customer's site for repair and maintenance.
Beer equipment model selection:
1, Based on years of experience, Cassman can provide standard models of beer brewing equipment. We have mature experience in brewing technology and equipment design.
2, Cassman can provide custom-made service as per customer's requirement. including customize brewhouse system, fermentation tank, brite beer tank, coffee equipment, whiskey distillation equipment, stainless steel tank, etc.
Brewery design:
Cassman can help to design layout for newly built brewery, and we will supply P&ID drawings, electrical connection diagrams,flow chart, tank drawings, etc. , 3D drawings are also available if needs.
Installation:
Cassman has 6 to 8 experienced technical engineers, we can provide on-site installation and debugging instruction as percustomer's needs.
1, To ensure good after-sales service, we will appoint the same technical personnel to debug and load the equipment beforedelivery,
2, For single tank, if on-site installation service is unnecassary, Cassman will provide equipment drawings and installation guides so that customers can install by themselves.


