Innovative Custom Aluminum Formwork for Unique Building Needs

Price $110.00 Compare
Min Order 1 Square Meter
Shipping From Henan, China
Popularity 449 people viewed
Quantity
+-
 

Henan Yingmo Aluminum Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Aluminum Formwork
Contact Us If You Need Any Help
None
Industrial Aluminium Profile
Flat
6061-T6
T3-T8
Industrial Aluminum Profile
Alloy
Powder Spraying
6061
ISO
Mechanical Polishing
6061-T6
25 Ton
Not Packed or Fumigated Wood Packaging
8480600090
2.72
USD
Yingmo
Container
Contact us for specific details
Shangqiu Minquan
8480600090
Product Description
 
Aluminum Formwork Assembly: A Comprehensive Insight

In the realm of modern construction, aluminum formwork assembly stands as a pivotal innovation. This process utilizes prefabricated aluminum panels and components to craft molds for concrete pouring, heralding an era of efficiency, speed, and exceptional reusability. These advantages set it apart from traditional methods. Let's delve deeper into the details:

 

Panel Placement:

  • Step 1 begins with the strategic placement of lightweight aluminum formwork panels, meticulously configured in alignment with the project's unique design and layout.
  • Expertly pre-engineered, these panels seamlessly fit together, ensuring precise dimensions and guaranteeing that the structure remains true to the intended design upon concrete pouring.
  • Thanks to their lightweight construction, aluminum panels are effortlessly manageable, minimizing physical effort on workers and accelerating the overall process.
  • Securing Panels:

    • In Step 2, a robust fastening of the panels is achieved using various connectors, such as clips, bolts, or wedges.
    • These fastening solutions ensure the panels form a rigid, stable mold, expertly preventing any gaps or misalignments.
    • Specialized accessories, including corner and edge connectors, maintain formwork integrity and effectively prevent leaks during the concrete pouring phase.
CUSTOMER: Incoterm:  FOB QingDao
 
Date: Dec 24th
Part No.Part DescriptionUnit price (USD/kg)Processing charges USD/kgTransport from Minquan to Qingdao Port USD/kg
1C100-C500 Panel  <A00(Changjiang Ingot price)(Today USD2.725)/1.13USD 0.49/kgUSD 0.08/Kg 
2C600 Panel USD 0.61/kg
3C100-C400 <(aluminum formwork (extrusion))A00(Changjiang Ingot price)(Today USD2.725)/1.13USD 0.34/kgUSD 0.053/kg
4C400-450-500(aluminum formwork(extrusion))USD 0.40/kg
5C600(aluminum formwork(extrusion))USD 0.50/kg
  • Adjustment and Alignment:

    • Once the panels are installed, Step 3 entails the meticulous fine-tuning of their positions, ensuring perfect alignment and leveling.
    • Precise alignment is crucial for maintaining the structural integrity and geometric precision of the concrete structure, guaranteeing correct dimensions and stability for walls, floors, or slabs.
  • Reinforcement Installation:

    • Step 4 focuses on the careful installation of essential steel reinforcement bars (rebar) within the formwork, precisely following design specifications.
    • Rebar plays a pivotal role in imparting tensile strength to the concrete, averting cracking or failure once it cures.
    • Reinforcements are meticulously positioned to ensure proper embedment in concrete during pouring.

Concrete Pouring:

  • With the formwork and reinforcement impeccably set, Step 5 ushers in the actual pouring of concrete into the meticulously prepared mold.
  • Aluminum panels ensure the concrete retains its desired shape as it sets, promising a smooth, accurate finish when the formwork is eventually removed.
  • Aluminum formwork delivers an exceptional surface finish, significantly reducing the need for additional post-hardening finishing work.


Dismantling and Reuse
:

  • Upon full curing of the concrete, Step 6 involves the careful dismantling of the formwork.
  • Due to aluminum's durability and corrosion resistance, panels are reusable many times, making this method a cost-effective and environmentally sustainable choice.
  • Panels are thoroughly cleaned, assessed for wear, and readied for future projects, minimizing material waste and cost.

The Remarkable Advantages of Aluminum Formwork Assembly:

  • Accelerated Construction: These lightweight panels simplify handling and assembly, substantially speeding up the construction process and culminating in shorter project timelines and swifter completions.
  • High-Quality Finish: This state-of-the-art aluminum formwork is engineered to deliver impeccably smooth and precise concrete surfaces, significantly minimizing the need for extensive and time-consuming post-pour finishing. Experience the difference with each flawless pour.
  • Reusability: Our aluminum formwork stands out with its unparalleled reusability, designed to accommodate multiple concrete pours effortlessly. This feature not only offers substantial savings on materials but also plays a crucial role in minimizing environmental waste, making it a sustainable choice for forward-thinking projects.
  • Cost-Effectiveness: Despite a potentially higher initial investment compared to conventional formwork, aluminum formwork shines through its long-term benefits. Experience the remarkable cost-effectiveness driven by its reusability and considerable reduction in labor expenses, presenting a smart investment for any construction.
  • Safety: Safety is paramount, and our aluminum formwork system is crafted to be lightweight and effortlessly manageable. This design alleviates physical strain on workers, thereby enhancing safety standards and creating a safer, more efficient work environment on construction sites.

Conclusion:

The assembly of aluminum formwork is a streamlined, efficient, and remarkably beneficial process compared to traditional systems. By offering rapid assembly, impeccable high-quality finishes, and remarkable reusability, it accelerates construction timelines and slashes project costs. This makes it the preferred choice for modern builders seeking efficiency and excellence in their construction ventures.

    FAQ

    Q: Are you trading company or manufacturer ?
    A: We are factory.

    Q: How long is your delivery time?
    A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

    Q: Do you provide samples ? Is it free or extra ?
    A: Yes, we could offer the sample for free charge.

    Q: What is your terms of payment ?
    A:Payment terms:30% down payment, 70% on Copy of B/L.
    Other Payment terms(LC) : letter of credit 60 days leave Qingdao port and 10% deposit.


    If any question, please feel free to contact us !
    Message Type
    * Message Content
    * Name  
    * Phone
    * Email
    * CAPTCHA