powder coating line
Oversea Service Available
1 Year
Coating Production Line
Powder Coating
Steel
CE, ISO
New
Ours-2014382
50-60Hz
220-380V
Customized
Engineers Available to Service Overseas
jsours
Carton or Wooden Case
CE
Yangzhou, Jiangsu Province
8424200000
Product Description





Advantages:
1. 20 Years of experience2. Low energy consumption
3. Convenient color change
4. High capacity
5. Full automatic or manual operation
We specialize in the whole line:
1) Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment
2) Conveying system: Closed-circuit conveyor, power and free conveyor, multi-track conveyor, and so on
3) Oven: Batch oven, combination oven, bridge curing oven, tunnel oven
4) Powder coating booth: Stainless steel booth or coated steel booth
5) Powder recycling facility:Cyclone pulse recovery system or pulse recovery system
6) Control system: PLC control, with or without touch screen
7) Spray gun and reciprocator



1. Purchase Service Ours coatinghas a specialized and efficiency working team. If you are new on the coating, some pictures or drawings of your products and workshop could be show to us will be appreciated , we will give you specialized suggestion of whole work . |
2. Shipping Service Ours coating has a specialized and independent department which just for shipping the buyer's goods .The workers know T/T, L/C Items well. All Exported documents could be made perfectly . Our company cooperates with the most famous shipping company in China also. They could provide the best and economic shipping ways to the buyer's port. |
3. Installation Services Installation Services are available with all our machines. Ours coating will dispatches technician to the Buyer's factory to install and trial operate the equipment. |
4.Clients' Training Services Our Company can accept the buyer send their own technician to our factory to learn how to operate machines. Also, training in the installation period is better acceptable. |
5.After Sales Service We provide one year of warranty period. Many spare parts will be prepared in the tool box together with machines. |

