FLD-988E
1 Year
Bag
Automatic Wrapping Machine
Electric
Beverage, Food, Machinery
Automatic
Stainless Steel 304
Wooden Cases
Rainbow Lollipop
Candy Manufacture
FLYLOONG
Wooden Cases with Steel Bases
CE&ISO
Jiangsu
8438200000
Product Description
1.The machine is suitable for sherical lollipop head packaging,automatic sugar feeding with novel structure,beautiful style,low noise,stbale operation,Convenient maintence and ohter cgaracteristics;
2.AC motor attached frequency converter,to achieve stepless variable speed control;
3.Automatic computer control,photo electric color tandard tracking;
4.Inernational advanced photo electric sensor detection,two-way tracking,With tracking with fast,accurate pattern;
5.Food contact parts are make of stainless steel,easy to clean, in line with health requirements.

Name | Power(kw) | Weight(kg) | Dimension(mm) | Capacity |
FLD-Ball lollipop packing machine | 2.85 | 1200 | 2500*900*1630 | 2-3 tons/8 hours |
Delivery terms
1.Port of shipment : Shanghai ,China.
2.Date of delivery : 4--6weeks after receive your 30% deposit
3.Packing : wooden,
4. Terms of Payment: 30% T/T down payment, and delivering the goods after receiving 70% balance
5. Testing &training:
The plant layout design, assembling and installation, start-up and local team training will be FREE. But the buyer should be
responsible for the round-air tickets, local transportation, board &lodging and $30/day/person for the pocket money to our
technicians.
6.Warranty:
The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, and
problems or defaults happen on the hard parts of our machinery ,the seller will replace the parts or send the technicians to the
buyer site for repairing and maintenance at the seller's cost(free).But if the defaults are aroused by defaulted operations, or
the buyer need the technical assistance for processing problems, the buyer should be responsible for all the cost
1.Port of shipment : Shanghai ,China.
2.Date of delivery : 4--6weeks after receive your 30% deposit
3.Packing : wooden,
4. Terms of Payment: 30% T/T down payment, and delivering the goods after receiving 70% balance
5. Testing &training:
The plant layout design, assembling and installation, start-up and local team training will be FREE. But the buyer should be
responsible for the round-air tickets, local transportation, board &lodging and $30/day/person for the pocket money to our
technicians.
6.Warranty:
The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, and
problems or defaults happen on the hard parts of our machinery ,the seller will replace the parts or send the technicians to the
buyer site for repairing and maintenance at the seller's cost(free).But if the defaults are aroused by defaulted operations, or
the buyer need the technical assistance for processing problems, the buyer should be responsible for all the cost



