12×12m Logistics Cold Storage / Best Ripening Rooms/Cold Room
Cool Room PU Panel
1.75mm/100mm/120mm/150mm/200mm double side color steel plyurthane panel 2.inside hooks for easy assembling 3.three phase for above 30M3 room 4.sliding door or open door for optional with lock swift 5.environmental friendly R404a refrigerants 6.Dafoss valve 7.All size,temperature,projects customize | ![]() |
PUR/PIR Panel
![]() | ![]() |
![]() | |
Thickness | 75mm 100mm 120mm 150mm 200mm |
Width | Standard: 950mm Customization Available |
Length | Maximum 10m without connection |
PU Parameters | Density ≥ 42kg/m³ Flame Retardent Time ≤ 5s Hook Distance = 900mm |
Plate | Color Steel |
Stainless Steel | |
BaoSteel | |
Embossed Aluminium | |
![]() | Cold Storage Door 1.Perfect sealing 2.Reliable, safe and easy to operate 3.Cold Room Door Series: hinged door,sliding door,swing door,replaced door 4.Replaced Door: Whether you want to replace the original door or open a new door of the old cold room. |
![]() | |
Smart Packaged Unit •Compressor HP: 2-15hp •Working Temp.:+5~-30ºC •Compressor Type: Scroll / Rotary •Independent developed smart CDU(Condensing Unit) controller •Advanced fuzzy controlled EXV module •Intelligent hot-gas defrost on demand •Condenser fan-speed controls •Self-diagnosis function Intelligent alarm system | Condensing Unit •Compressor Optional: 1-Hermetic Scroll 2-Semi-hermetic or Screw •Condenser:Air cooled or Water cooled •Frame:can be stell shell with spray painting or open type on stell frame •Refrigerant:R404a |
![]() | ![]() |
Unit Cooler * Collared fan outlet for wide air throw * SS ceiling mounting clamps for easy installation * Double drip tray * Al Mg powder coated, GI powder coated & SS 304 casing for rust free operation * Bullet expansion on tubes * Cooling capacity ranging from 1.2 kW to 60 kW * Fin spacing available from 4.5 mm to 12mm |





Q:How long is the warranty?
A:Warranty is 12 months. However, we will provide timely maintenance suggestions and spare parts support for all the problems that have occurred in the cold storage of our customers these years.
Q:What kind of technical support can you provide?
A:Both our sales and engineers can provide 24 hours online support. Panels are supplied with installation drawings. Installation manuals and electrical diagrams are included with the cooling system. Accessories support is available for all of our products.
Q:Can you send an engineer to the site to install?
A:At present, due to the epidemic, the cost of our engineers going abroad is too high. Returning from abroad requires up to 14 days of quarantine. We recommend that it is more cost effective to find a refrigeration engineer locally. We can provide full online technical support.
Q:Is the condensing unit noisy?
A:We have very quiet options, scroll compressors and rotary inverter compressors are very quiet. It is very suitable for cold storage such as supermarkets and beer houses.
Q:How long is the lead time?
A:Usually for units we need 35 days to produce. If it is a special voltage of 60hz, the production time needs to be extended by 5-10 days. Panels and other things usually we need 7-20 days depends on amount.