Toroidal Core
Power, Electronic, Instrument, Lighting, Rectifier, Audio
Single
Shell-type Transformer
Dry-type Transformer
Auto-transformer
ISO9001-2000, ISO9001, CCC
Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer, Toroidal Transformer Core
High Frequency
Ring
Jirui
Non-Oriented Silicon Steel /Oriented Silicon Steel
Cold Rolled
Customized
Coated
1%
Silicon Steel
8-15days
White or Black
50Hz-1000Hz
Annealing/Non-Annealing
Jirui
Cartons/Pallets
Customized
Ningbo, Zhejiang, China
8504901900
Product Description
The production of toroidal core is completed by automatic ring winding machine. The size of toroidal core is determined according to your needs. Every toroidal core produced by us will be tested by electromagnetic to ensure that it is in the appropriate frequency.
SIZE | Customized |
THCIKNESS | 0.23-0.35MM (CRGO) 0.35-0.5MM (CRNGO) |
MATERIAL | M3, M4, M5, M6 (CRGO) 35W250, 35W300, 35W400 (0.35MM) M330-35A 50W250, 50W310, 50W400, 50W470, 50W600, 50W800 (0.5MM) 50W1000,50W1300 M400-50A 26M1 |
FREQUENCY | 50HZ-1000HZ |
COATING | T2 Inorganic ( CRGO ) T4 Semi-organic (CRNGO) |
PROCESS TECHNOLOGY | ANNEALLING & WITHOUT ANNEALLING |
APPLIANCE | CONTROL TRANSFORMER, AUTO TRANSFORMER, ISOLATION TRANSFORMER,POWER TRANSFORMER,BALLAST,REACTOR,INDUCTOR,INVERTER POWER,TOROIDAL TRANSFORMER ,VOLTAGE STABILIZERS.etc. |

Toroidal cores can be used in toroidal transformers.



Q1:Are you a Manufacturer?
A:Yes,we both Manufacturer and trading company,you will own high quality and competitive price.
A:The sample is free,you only need to bear the freight .
Q3: Do you have the products in stock?
A:Yes,we will keep some general ones in stock.
Q4: What's the delivery time?
A:Sample order needs 5-7 days.Formal order needs 15-21 days. Specific delivery time depends on the order situation.
Q5: What's your payment terms?
A: We usually accept T/T at sight as the main payment terms,and other payment can also be negotiated.
Q6:What is your terms of delivery?
A: EXW,FOB, CIF From Ningbo Port.
Q7:Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.