Smart Arch Anchor Trolley with Integrated Navigation System Arch Anchor Integration

Price $1.00 Compare
Min Order 1 Piece
Shipping From Sichuan, China
Popularity 305 people viewed
Quantity
+-
 

Sichuan Lanhai Intelligent Equipment Manufacturing Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
LGM312U
1 Year
CE, RoHS, ISO 9001:2000, ISO 9001:2008
New
6 Month
6 Month
41~102mm
4m
36t
138.5kw (National IV)
92kw
Electric Construction + Diesel-Powered Walking an
Wireless Remote Control + Manual Control
380V
17×12m
Operating Chassis
Bidirectional Driving (Front and Rear Dual Cabs)
Four-Wheel Drive, Four-Wheel Steering
380mm
36%
15m (Two Wheels)/ 8m (Four Wheels)
15km/H
15.4°/15.7°
LANHI
Nothing
11360× 3250× 3355mm
China
Product Description
Product Description

The LGM312U intelligent integrated arch anchor trolley features an engineering chassis and is equipped with a single anchor system. The machine features four-wheel steering, four-wheel drive, two-way driving and other functions. Its diesel-electric dual power system supports electric construction and diesel-powered emergency operations. The three-arm remote control can meet the requirements for prefabricated arch frame installation, operation of various benching methods and precise positioning adjustment of the arch frame. The arch frame can handle under-excavation and welding operations during installation, and the tunnel itself is very flexible.
Functional integration: The intelligent integrated arch anchor trolley integrates multiple processes into one,Including measuring and placing points, under-excavation operations, arch frame installation, advance support, system anchor   construction, anchor grouting (optional), anchor net installation, etc.
 
Equipment digitization(Optional): including cluster management, positioning function, video surveillance, walkie-talkie function, pre/alarm function,data management function, tunnel BIM technology and digital twin, construction report management, tunnel contour scanning, remote control and other functions.
High efficiency: Consists of a three-arm, three-gripper, and two-basket structure. The maximum lifting force of the middle arm is 2 tons. The entire construction process can be completed in about an hour.
Installation of prefabricated arch frames: Our company's patented multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation techniques are used to produce the arch frames outside the
tunnel. This reduces the required working time on dangerous surfaces and construction safety risks, and greatly improves overall efficiency.

Single anchor system: The maximum drilling depth reaches 4.5m, and the middle arm frames can perform feet locking, system anchoring and advance anchoring operations.
Expandable hanging basket: The equipment is equipped with a expandable hanging basket, which features a larger operating space that can be used to install explosives and anchor rods.
 
Optional grouting function: The equipment is equipped with an optional grouting system, allowing grouting operations to be quickly performed after the anchor has been installed.
 
Less operating personnel: The entire construction operation can be completed by only 3-4 people, where traditional operations would require 8 or more.
 
Auxiliary function integration: The equipment comes with a breaker hammer and welding machine, which can perform under-excavation processing and welding operations when the arch is installed.

Product Parameters
Transport dimensions (L × W × H)11360×3250×3355mm
Total weight36t
Engine power138.5kW (National IV)
Installed electrical power92kW
Operating modeElectric construction + diesel-powered walking and emergency
Control modeWireless remote control + manual control
Operating voltage380V
Operating range (width × height)17×12m
Chassis formOperating chassis
Driving modeBidirectional driving (front and rear dual cabs)
Driving and steering methodsFour-wheel drive, four-wheel steering
Minimum ground clearance380mm
Maximum grade36%
Turning radius15m (two wheels)/ 8m (four wheels)
Maximum speed15km/h
Approach angle/departure angle15.4°/15.7°
Arm support modeTwo stage telescopic
Arm support quantity3
Hanging basket modeExpandable
Number of hanging baskets2
Number of grippers3
Maximum lifting capacity of middle arm2t
Maximum lifting capacity of left and right arms1.5t
Number of rock drills1
Power of rock drills18kW
Advance beam5590mm(Optional6200/4990mm)
Drill Pipe4305mm(Optional4915/3700mm)
Maximum drilling depth4m(Optional4.6m/3.4m)
Drilling diameterΦ41~Φ102mm
Discharge volume0.4m³/min
Discharge pressure0.8MPa
Flow rate4m³/h
Pressure15.3bar
Welding machines3 sets
Breaking hammers2 sets
Grouting systemOptions
Detailed Photos

FAQ

1,What can you buy from us?

Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.

2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.

3,What payment terms do you accept?
We accept T/T with a 50% prepayment.

4,What about the order lead time?
The usual lead time is 15 days.

5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.

6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.

7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA