FC-KP13
Galvanized Steel Pipe, PVC, Plywood, LLDPE
Slide
3-12 Years
Amusement Park
Rotational Moulding
Customized
>10
CE
New
Natural Themed
Roller Slide,Fiberglass Slide ,Trampoline
Customized According to Space
Instructions or Engineer Guidance
5m
Funcaslte
Bubble Film
Customized
Guangzhou, China
950699900
Product Description
Custom Design Multiple Play Activities Plastic Tunnel Naughty Castle Indoor Playground
Feature :
*3 level play structure ,with multiple play games
*Natural themed Naughty Castle Indoor Playground
*Various Slide,Roller slide ,fiberglass slide, Plastic slide
*Separate trampoline area ,for parents and kids play together
*Coconut spinning equipment


Installing an indoor playground can vary in difficulty depending on several factors such as the size of the playground, the type of equipment, and the complexity of the design. Generally, the installation process involves several steps including site preparation, equipment assembly, and safety testing.
Site preparation involves assessing the available space and ensuring that it meets the requirements for the playground's size and layout. This may involve removing obstacles, leveling the ground, and installing necessary safety measures such as padding or flooring.
Equipment assembly can also be a time-consuming process, especially for larger playgrounds or those with complex features such as tunnels or slides. It may also require specialized tools or equipment to ensure that the installation is done correctly.
Once the equipment is assembled, safety testing is necessary to ensure that the playground meets all safety standards and regulations. This may involve checking the stability of the equipment, testing the impact resistance of the flooring, and assessing the overall safety of the playground.
Overall, the difficulty of installing an indoor playground can range from moderate to difficult depending on the specific circumstances. It is important to have experienced professionals handle the installation process to ensure that it is done safely and correctly.




Feature :
*3 level play structure ,with multiple play games
*Natural themed Naughty Castle Indoor Playground
*Various Slide,Roller slide ,fiberglass slide, Plastic slide
*Separate trampoline area ,for parents and kids play together
*Coconut spinning equipment

Name | Custom Design Naughty Castle Indoor Playground |
Size | Customized ,Height with 5m,Customized according to clients space |
Advantage | 1)Make the reasonable space planning priority than the 3d design,integrated with operational idea on the space planning 2)High quality with best price ,the installation performance keep same with the design . 3)Strong design team with creative idea and plan for clients ,meet with some special requirements provided by clients 4)Good after-sales service ,especially for the installation ,3D plan and video support . |
Play Activities | Roller slide,Trampoline ,Fiberglass slide ,Plastic tunnel,Ball blaster,Sand pit ,Ball pool,Coconut spinning tree |
Material | LLDPE plastic,PVC, Galvanized steel pipe, Soft mat, EPE sponge,fiberglass 1) Plastics parts: imported LLDPE 2) Pipe:1.5~2.0 mm double hot-galvanized pipe with 0.45 mm PVC foam coated, Diameter: 48mm. 3) Soft parts: innermost: wood, middle: sponge, outmost: PVC 4) Mat :2.0cm EVA, double color, different sizes and colors for your selection |
Apply To | Amusement park, Shopping mall ,Amusement center |
Design theme | Customized according to demands ; |
Certificates | CE ,TUV GS, TEST REPORT |
Installation | Professional auto Cad installation instruction , 3D structure instruction ,3D video support |
Warranty Period | 5 years for metal frame ,3 year for plastic parts ,1 year for the soft play parts |
Capacity Reference | Around 500 kids capacity for this kids games indoor playground equipment |

Installing an indoor playground can vary in difficulty depending on several factors such as the size of the playground, the type of equipment, and the complexity of the design. Generally, the installation process involves several steps including site preparation, equipment assembly, and safety testing.
Site preparation involves assessing the available space and ensuring that it meets the requirements for the playground's size and layout. This may involve removing obstacles, leveling the ground, and installing necessary safety measures such as padding or flooring.
Equipment assembly can also be a time-consuming process, especially for larger playgrounds or those with complex features such as tunnels or slides. It may also require specialized tools or equipment to ensure that the installation is done correctly.
Once the equipment is assembled, safety testing is necessary to ensure that the playground meets all safety standards and regulations. This may involve checking the stability of the equipment, testing the impact resistance of the flooring, and assessing the overall safety of the playground.
Overall, the difficulty of installing an indoor playground can range from moderate to difficult depending on the specific circumstances. It is important to have experienced professionals handle the installation process to ensure that it is done safely and correctly.




