ISO9001
Household
5 Cubic Meter/Day
520 Kg
Sewage Treament
1 Year
2130*1150*1650mm
Wastewater Treatment
Pump, Blower, Mbr
380V /Customized
New YuDa
Pallets
PP Materials
Guangxi, China
Product Description


Productivity (m3/d) | L*W*H (mm) | Weight (kg) | Thickness (mm) | Power (w) | Material | Floor Area |
0.5 | 1950*1170*1080 | 110 | 4-5 | 38 | SMC Molding | 12 |
1 | 2400*1300*1400 | 180 | 6-7 | 45 | 18 | |
2 | 2130*1150*1650 | 200 | 6-7 | 55 | 18 | |
5 | 2420*2010*2000 | 520 | 7 | 110 | 25 | |
8 | 3420*2010*2000 | 650 | 7 | 110 | 30 | |
10 | 4420*2010*2000 | 780 | 7 | 170 | 33 | |
15 | 5420*2010*2000 | 910 | 7 | 220 | 43 | |
20 | 7420*2010*2000 | 1200 | 7 | 350 | 52 |




Performance characteristics of underground PP integrated sewage treatment equipment:
(1)Emissions meet standards. The organic matter is effectively decomposed and degraded into inorganic matter, and then undergoes precipitation and disinfection. The effluent is stable and clear, meeting the discharge requirements.
(2) Advanced technology. Underground PP integrated sewage treatment equipment is a non-standard product. Our company's technology is mature and the equipment can be customized according to user needs.
(3) Low operating cost. The sludge production is small and need to be transported out every 90 days or more days.
(4) Fully automatic operation. Equipped with a fully automatic electrical control system, equipment failure alarm and remote monitoring system, the operation is stable and requires no personnel on duty, saving labor costs.
(5) Save investment and occupy a small area. PP integrated sewage treatment equipment can be built under the surface, and the upper surface can be used as greening or other land. There is no need to build houses, heating or insulation. Mobile installation is also possible.
(6) The sewage treatment effect is good, and the treated water volume is stable and up to standard.
(3) Low operating cost. The sludge production is small and need to be transported out every 90 days or more days.
(4) Fully automatic operation. Equipped with a fully automatic electrical control system, equipment failure alarm and remote monitoring system, the operation is stable and requires no personnel on duty, saving labor costs.
(5) Save investment and occupy a small area. PP integrated sewage treatment equipment can be built under the surface, and the upper surface can be used as greening or other land. There is no need to build houses, heating or insulation. Mobile installation is also possible.
(6) The sewage treatment effect is good, and the treated water volume is stable and up to standard.












