Metal Stainless Steel Wall Mounted Handrail for Stairs

Price $25.00 Compare
Min Order 1 Meter
Shipping From Guangdong, China
Popularity 412 people viewed
Quantity
+-
 

Shenzhen Ace Architectural Products Co., Limited

VIP   Audited Supplier 9 years
Profile Certified by SGS/BV
Ace-H01
ISO9001, CE, ANSI Z97.1
Polish
Satin/Mirror
Stainless Steel
30 Days for Prodcution
10 Years
Satin, Mirror
Customized
SUS304, SUS316, SUS2205
Top, Side, Slot Handrail
42.4*1.2, 50*50*1.2, 50.8*1.2, 50*25*1.2
ACE ARCHI
Plywood Carton
40*40*1100mm
China
Product Description
Metal stainless steel wall mounted handrail for stairs
1:What should i provide for quote ?

01:dimension, quantity, surface finish or drawing





Our Factory And Show Room:

Our advantage is as below:

 1. We are a real manufacturer, not trading company, with competitive price

 2. Professional design team, will make proper suggestion for all project drawing to control or lessen purchase cost.

 3. Offer oversea take meamsurement and installation service, solve all your skill problems.

 4. With German processing machine to ensure polish quality

 5. All of our products meet material test standard from ASTM,BS2026,CE and DIN/EN 12600

6. More than 7000m2 size factory, with professional manufacturer management.

 We are a more than 15 years manufacture up to now, below is some projects we did before, share with you, any model you like

FAQ:

When do I start?
Contact us at the beginning of the design phase when you have the most options available and our expertise can be most helpful. We will meet your design requirements and bring value and dramatic design to your project. The longer you wait the more you limit your options or create unusual and costly framing changes. 

How do I start? 
Browse the website, make your choices: Type of Stair, style, wood and finishes. Once you know what you want, contact us for a site measurement.  The details to your customized project will then be reviewed and finalized in a formal contract. 

How do I order? 
We will finalize the details and send a contract for you to sign. A shop drawing will follow for approval.  A field technician will confirm field dimensions and the stairs go into production. 

When does the stair arrive? 
Once the staircase finished production and trial installation we will pack it and dliver to your jobsite, it takes around 45 days . 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA