22HP Diesel Engine 100m Hydraulic Rotary Borehole Drilling Rig for Sale

Price $5000.00 Compare
Min Order 1 Piece
Shipping From Hunan, China
Popularity 201 people viewed
Quantity
+-
 

Guangzhou International Technology Co., Ltd.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
PD22HP
Provide
1 Year
CE, ISO 9001:2000
New
AC Motor
75-400mm
100-150m
PDC Bits,Alloy Bit
Rotary
Wheels
Water Well Drill Rig
1900*1100*1800mm
400kg
Portable, High Drilling Efficiency
Pearldrill
Wooden
PD22HP, PD32HP
China
8430419000
Product Description

Product parameters

Water well drill rig
Model22HP
Drilling depth50-120M
Drill pipe diameter51mm
Hole diameter110-400mm
End hole diameter110mm
Drilling inclination360°
L*W*H1900*1100*1800mm
Weight400KG
Crushing methodrotary drilling rig
Construction sitesurface drilling rig
Diesel Engine22HP
Power16.8KW

Details show

Instruction Manual for New Hydraulic Drilling Rig
Thank you for choosing to use our hydraulic drilling rigs, and I hope you can give us better feedback.
. Installation and debugging
1. First check whether the drilling rig equipment and tools are in good condition.
2. First add 30-40 catties of hydraulic oil, gasoline engine should add 95 gasoline, gasoline engine oil should be replaced in time.
3. When lifting, do not lift the drilling rig too high, and it is forbidden to stand or work below.
4. Please read the instruction manual and perform the actual drilling work after the operation is proficient.
. Matters needing attention
1. During the actual drilling, first find the position of the wellhead, and level the position where the machine is placed to avoid shaking.
2 Stand up the folded part of the drilling rig and fasten the fixing point screws.
3. Connect one end of the high-pressure water pipe to the water inlet of the main engine, and the other end to the water outlet of the pump, and tighten it with iron wire.
4. Dig a reservoir next to the well drilling machine, put the water inlet of the pump directly in the pool, and use circulating water when working.
5. When drilling, the safety cover is opened, the drill bit and the drill pipe are connected to the main engine, and the wire rope is kept in a slack state. No matter whether each rod is drilled to the bottom, the main engine part falls to the bottom. When changing the rod, lift it up again and close the safety cover. Well, let the joint head be 5 cm above the safety cover, and rewind the wire at this position.
6. When drilling down two to three drill pipes, make sure whether the water pump is blocked by mud, and keep the water pump running smoothly, so as not to block the drill bit or the mud can not rush up, causing difficulty in lifting the rod.
7. During drilling, if it is necessary to rewind the wire, first stop the reversing switch to the middle position, and wait until the speed of the drilling rig stops before rewinding the wire.
8. In the process of transportation, it can be installed separately, be careful not to damage the parts, and not to be exposed to rain or water.
. Mastering the water layer
When the drilling rig is about to drill to the required depth, it should be noted that the water is washed with large grains of sand or mud, like water-white mud eggs, irregularly rounded and somewhat smooth, all of which are water layers. so far.
.Equipment maintenance
Whether the gear box of the drilling rig and the reduction box of the lifting rod are short of oil, every time the well is drilled and completed, the water pump, drill bit and joint head should be flushed, and the joint head, V-belt, wire rope, etc. should be checked frequently for damage or replaced in time. We are not responsible for any accident caused by improper operation, please use it carefully. Please contact us if you have any details.


Major equipment

What we offer:
1) Good quality control
2) Highly competitive prices
3) state-of-art technology products
4)Our well drilling rig sales in China first, China's largest well drilling rig manufacturer
5) Smooth communication

-COMPANY BRIEF-
We provide high-quality and complete drilling equipment including drilling rigs, drilling tools, mud pumps, DTH drilling tools, rock drilling tools, etc. They are widely used in water wells, farmland irrigation, geological exploration, small pile holes, geothermal, rope coring, Mining etc. Our products are the products of choice for drilling engineers in many countries due to their precise design and efficient drilling in use.

Main product


Application

Borehole drilling, Civil Infrastructure, civil engineering, and infrastructure, for rock core drilling, Soil Testing and sampling, geophysical survey companies, Pile foundation drilling, bridge drilling, wind power generation, large-mouth engineering drilling, oil field, metallurgy, mining, geological mineral exploration, water conservancy and hydropower construction, coal mine, mine tunnel drilling, grouting reinforcement engineering, highway, subway, high-speed rail, concrete core sampling, etc, Coring exploration, drilling.

Workshop
Why we achive today′s achievements is because we are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients. Guangzhou International Technology  Co.,Ltd. will continue committing to provide low cost Rock Drills, Drilling tools, well drilling rigs, high efficiency drilling tools, energy saving and environmental product for domestic and international clients.

-WHY CHOOSE US-

--The first-class engineers of tricone bits and PDC bits
--Advanced technology and Equipment, International standard.
--R&D center for rock drilling tools, high precision CNC machines, SGS&ISO Certified.
--10+ Years & 40+ Countries of service experience.
--Optimized solutions for the various requirements.

DIY customization: please provide your rock formation information or detailed size drawings.

Free samples: some samples can be provided free of charge.

Payment:T/T L/C,D/A,D/P,Western Union,MoneyGram.
 

Packaging
Wood Box
Fumigation Tray if necessary
Other special package can be applied
according to customer's need
Delivery
Prepared to deliver within 1 week, if in stock
Depends on order quantity, when out of stock
Transportation:By sea or air

 

Purchase process


 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA