
Complete Automatic CSD Carbonated Soft Drinks Energy Beverage Soda Drink Water PET Bottle Filling
Features:
1. Compact structured, good-looking, easy to operate and highly automated.
2. Air conveyor is directly linked with infeed starwheels, making it easier to change bottles without screws and conveyor chains.
3. Bottles are conveyed with neck blocked. Bottles can be changed through some replacement of guiding sheets, starwheels of nylon instead of height adjustment of machine.
4. Rinser-clamp of special design is strong and endurable, without contact with worms at bottle-mouth, to prevent bi-pollution.
5. Highly effective spraying nozzles equipped on the rinser-clamp can rinse every side of inner bottle and save water.
6. Parts with contact with material are all made of stainless steel of food-grade, no dead angles and easy to clean up.
7. Feed-in volume is controlled to ensure accurate filling.
8. Valve on-off system is driven by pneumatic cylinder, which starts on bottle signals.
9. High-speed and highly accurate filling valves ensure no loss of liquid at high speed.
10. Bottles are kept with necks blocking when going up and down by elevator-cylinder, which apply to thin bottles with equal force instead of spring problem.
11. Equipped with CIP clean-in-place.
12. Bottle support-sheet in infeed starwheels goes down via screw. Bottles can be changed without adjustment of height of conveyor chain.
13. Capping heads are magnetic constant-torque equipped to ensure capping quality with no damage.
14. Highly effective cap sorting and feed in system is protective for feed in and cap absence.
15. Equipped with overload system to safeguard machine and operators.

Washing part
1.Enhanced food safety:Stainless steel304/316L for allcomponents in contact withyour beverage;

1.304/316 Stainless steel high precision fillingnozzle;
3.All 304/316 stainless steel contact parts &liquid tank,fine polish,no death corner,easy to clean.

1.Place and capping system,electromagneticcapping heads,with burden discharge function,make sure minimum bottle crash during capping
2.All 304/316 stainless steel construction
3.No bottle no capping
4.Automatic stop when lack of bottle
Model | Output/Capacity | Power | Size | Weight |
DCGF8-8-3 | 1000BPH | 3KW | 2000*1550*2250 MM | 2500KG |
DCGF14-12-5 | 2000BPH | 5KW | 2200*1560*2300 MM | 3000KG |
DCGF18-18-6 | 3000-4000BPH | 5KW | 2250*1670*2300 MM | 3500KG |
DCGF24-24-8 | 5000-6000BPH | 6KW | 2800*1800*2300 MM | 5000KG |
DCGF32-32-10 | 8000-10000BPH | 8KW | 4300*3500*2300 MM | 7000KG |
DCGF40-40-12 | 10000-12000BPH | 12KW | 4600*3800*2300 MM | 10000KG |
DCGF50-50-12 | 12000-15000BPH | 15KW | 5000*4200*2300 MM | 12000KG |
DCGF60-60-15 | 15000-18000BPH | 18KW | 5500*4500*2300 MM | 15000KG |
PREPARATION SYSTEM(WATER TREATMENT SYSTEM+BLENDING SYSTEM)
1.Water Treatment System
Applicable water source: Well water, underground water, tap water, river water, spring water, mountain water, etc.
Treated water kind: Pure water, still water, mineral water, alkaline water, etc.
Core filtration equipment: Reverse Osmosis or hollow ultrafiltration.
Electricity control system: Germany Siemens PLC
Treated the raw water into drinkable water.(Customized according to customer water quality)2.Blending System
Beverage mixing is an art. By combining different ingredients and adjusting the proportions, a rich variety of drinks can be created.


3.Drinks Mixer
Automatic Carbonated beverage mixing system with reasonable & high efficiency structure , high mix precision , CO2 mixing fully, two stage of cooling, two carbonation merits. Mainly is suitable for kinds of carbonated drink's mix processing and carbonation, also may use in the paste drink, the fermentation drink and so on other soft drinks' mix processing.
1 The machine with a chemical industry advanced technology - static mixer (ie carbonizer), its gas-liquid mass transfer area is large, small pressure loss, high efficiency, low energy consumption, simple structure, reliable performance and the use of noise small multi-stage centrifugal pumps, so that the whole performance is guaranteed;
2 Mixing ratio accurate, easy to adjust, the machine does not require replacement parts, you can easily yield and the ratio of syrup and water was adjusted;
3 Reflow machine uses carbon dioxide oxygen, carbon dioxide gas can save, but also to achieve the purpose of deoxy make deoxygenated water has a good pre-carbonization effect;
4 The machine easily adjust the air content, according to the requirements of beverage containing gas through proper operation and adjustment is completed;
5 The machine set up perfect automatic control system with motor coordination, simple structure, continuous production, automation features.


A high-pressure fan is used to blow air, so that high-speed air is ejected from the nozzle, so that the water droplets on the
bottle body are blown away as much as possible. The nozzle position can be freely adjusted according to the bottle height.

Opp hot melt labeling machine has great advantages in labeling speed and efficiency, and the later consumables are relatively cheap. It is mostly suitable for carbonated beverage.

Common capacity range: 8-45 pack/min
Packing Material: LDPE filmPacking method: Film wrapping and shrinking
Shrinking method: By electricity heating
Automation degree: Fully automatic



Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 15 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If
needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.