Cobalt-Containing Cone Shank Twist Drill Bit Steel Super Hard Drill Stainless Steel Special to Cobalt Iron Aluminum Alloy High Hardness 14-65mm

Price $8.00 Compare
Min Order 10 Pieces
Shipping From Sichuan, China
Popularity 233 people viewed
Quantity
+-
 

Chengdu Gyration Cnc Tool Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
drill bit
Customized
DIN, JIS, AISI, API
Stub-length
Twist Drill Bit
Tungsten Carbide
Wood Drilling, PCB Drilling, Metal Drilling
CNC Drilling Machine/Machining Center
According to Samples/Drawings
1.000kg
89% Carbide, 10%Co and 1% Ot
Gyration
1PC in a Plastic Tube, 10PCS a Group
General
Sichuan
8207709000
Product Description
Product Description
 
Product Parameters
ITEMSPECIFICATIONDIAMETERTOTAL LENGTHFLUTE LENGTHShank Length
D2103-LH-3DD3-D3.76622036
D2103-LH-3DD4-D4.76662436
D2103-LH-3DD4.8-D66662836
D2103-LH-3DD6.1-D78793436
D2103-LH-3DD7.1-D88794136
D2103-LH-3DD8.1-D1010894740
D2103-LH-3DD10.3-D12121025545
D2103-LH-3DD12.1-D14141076045
D2103-LH-3DD14.1-D16161156545
D2103-LH-3DD16.1-D18181237350
D2103-LH-3DD18.1-D20201317950
D2103-LH-5DD3-D3.76662836
D2103-LH-5DD4-D4.76743636
D2103-LH-5DD4.8-D66824436
D2103-LH-5DD6.1-D88915336
D2103-LH-5DD8.1-D10101036140
D2103-LH-5DD10.3-D12121187145
D2103-LH-5DD12.1-D14141247748
D2103-LH-5DD14.1-D16161338348
D2103-LH-5DD16.1-D18181439348
D2103-LH-5DD18.1-D202015310150


FAQ

1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

2) What is your products range?

Carbide Square end mill, Carbide Twist Drill, Carbide Reamer, Carbide center Drills, Carbide Ball Nose End Mill,Carbide Corner Radius End Mill, Carbide End Mill for Alumium, Carbide Roughing End Mill, Carbide Micro End Mill,Carbide Single Flute End Mill, Carbide Step Drill, Carbide Pilot Drill, External Carbide Drill, Coolant Drill Bit

3) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?

After you place an order, the production handling time is about 20 days. We need 5 days to prepare all the stuff then 15 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are in. It could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) Are you a trading company or manufacturer?

We are a professional manufacturer. 

 

7) Where is your factory located?

We are located in  Xixiashu Town, New North District, Changzhou City, Jiangsu, China

8) How about your stock?

We have large quantity products in stock, regular types and sizes are all in stock.

9) Is free shipping possible?

We don't offer a free shipping service. We can have a discount if you buy a large number of products.



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA