Tungsten Steel Center Drill a/B Type 60 Degree Center Drill Machining Center Alloy Drill CNC Lengthened CNC Positioning 3 4

Price $8.00 Compare
Min Order 10 Pieces
Shipping From Sichuan, China
Popularity 322 people viewed
Quantity
+-
 

Chengdu Gyration Cnc Tool Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Customized
DIN, JIS, AISI, API
Stub-length
Center Drill Bit
Tungsten Carbide
Wood Drilling, PCB Drilling, Metal Drilling
CNC Drilling Machine/Machining Center
According to Samples/Drawings
1.000kg
89% Carbide, 10%Co and 1% Ot
Gyration
1PC in a Plastic Tube, 10PCS a Group
General
Sichuan
8207709000
Product Description
Product Description
 
Diameter
Shank Diameter
Overall Length
1.0mm
3.15mm
32.0mm
1.5mm
4.0mm
36.0mm
2.0mm
5.0mm
40.0mm
2.5mm
6.3mm
45.0mm
3.0mm
8.0mm
50.0mm
4.0mm
10.0mm
56.0mm
5.0mm
12.5mm
63.0mm
6.0mm
14.0mm
65.0mm
Product Parameters


FAQ

1) When can I get the price?
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.

2) What is your products range?

Carbide Square end mill, Carbide Twist Drill, Carbide Reamer, Carbide center Drills, Carbide Ball Nose End Mill,Carbide Corner Radius End Mill, Carbide End Mill for Alumium, Carbide Roughing End Mill, Carbide Micro End Mill,Carbide Single Flute End Mill, Carbide Step Drill, Carbide Pilot Drill, External Carbide Drill, Coolant Drill Bit

3) How long can I expect to get the sample?

After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.

4) How long does the whole procedure being worked out?

After you place an order, the production handling time is about 20 days. We need 5 days to prepare all the stuff then 15 days for manufacturing.

5) What about the transportation and delivery date?

Normally we use shipment to transport the goods. It is about 25-40 days. It also depends on which country and port you are in. It could be shorter if you need to send the goods like Asian. If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.

6) Are you a trading company or manufacturer?

We are a professional manufacturer. 

 

7) Where is your factory located?

We are located in  Xixiashu Town, New North District, Changzhou City, Jiangsu, China

8) How about your stock?

We have large quantity products in stock, regular types and sizes are all in stock.

9) Is free shipping possible?

We don't offer a free shipping service. We can have a discount if you buy a large number of products.



Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA