Premium Cold Drawn Seamless Steel Tubing for Precision Engineering

Price $800.00 Compare
Min Order 1 Ton
Shipping From Fujian, China
Popularity 424 people viewed
Quantity
+-
 

Fujian Bluesky Pipe Manufacturing Co., Ltd.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
OD 15-80mm
Free
Free
Seamless
Cold Drawn
Carbon Steel
Oiled
Hydraulic/Automobile Pipe, Machinery Industry, Special Purpose
Round
Yes
15-70mm
1-20mm
Yes
bluesky pipe
Bund
China
7304319000
Product Description
Company Profile
 

Product Description
 

   Cold drawing is a processing technique for materials. For metal materials, cold drawing refers to the process of drawing at room temperature in order to achieve a certain shape and mechanical properties. Cold drawn products have the advantages of high dimensional accuracy and good surface smoothness compared to hot forming.
  Cold drawn steel pipes are precision cold drawn seamless pipes with high dimensional accuracy and good surface smoothness used in mechanical structures and hydraulic equipment. Choosing precision seamless pipes to manufacture mechanical structures or hydraulic equipment can greatly save machining hours, improve material utilization, and also contribute to improving product quality.


Product Parameters
Equivalent Material referance:
GBTOCTASTMBSJISNFDIN
10F 1010040A10 XC10 
101010,101,012045M10S10CXC10C10,CK10
20201020050A20S20CXC18C22,CK22
45451045080M46S45CXC45C45,CK45
30CrMo30XM41301717COS110SCM42030CD4 
42CrMo 4140708A42 42CD442CrMo4
   708M40   
35CrMo35XM4135708A37SCM335CD434CrMo4
Size tolerance      
ODStandard toleranceSpecial tolerance
Outer DiameterGB/T3639DIN2391EN10305O Dthickness
4mm-20mm±0.10 mm±0.08 mm±0.08 mm±0.05mm±0.05mm
20mm-30mm±0.10 mm±0.08 mm±0.08 mm±0.08 mm±0.08 mm
31mm-40mm±0.15 mm±0.15 mm±0.15 mm±0.10 mm±0.08 mm
41mm-60mm±0.20 mm±0.20 mm±0.20 mm±0.15 mm±0.15 mm
61mm-80mm±0.30 mm±0.30 mm±0.30 mm±0.20 mm±0.20 mm
SizeOD 15mm-75mm
Thickness 1-12mm
ProcessingCold rolled/ Cold drawn
1. BK (+C)  No heat treatment after last cold forming process.
2. BKW (+LC) After last heat treatment there is a light finishing pass ( cold drawing)
3. BKS (+SR) After the final cold forming process the tubes are stress relieve annealed.
4. GBK (+A) After the final cold forming process the tubes are annealed in a controlled  atmosphere.
5. NBK (+N) After the final cold forming process the tubes are annealed above the  upper transformation point in a controlled atmosphere.
PackingWoven bag/ Wooden or crate carton/ Bundle Packing/ Plain end or vanished as per  customer's request.
Delivery timeNormally 20-30 working days
Certifications

 

FAQ

Q: Are you trading company or manufacturer?
A: We are professional manufacturer for steel pipes,and our company also is a very professional and technical foreign trade company for steel products. We have more export experience with competitive price and best after-sales service. Apart from this,we can provide a wide range of steel products to meet the requirement of customer.

Q:Will you delivery the goods on time?
A: Yes,we promise to provide best quality products and delivery on time no matter if the price change lot or not. Honesty is our company's tenet.

Q: Do you provide samples ? is it free or extra?
A: The sample could can provide for customer with free,but the freight will be covered by customer account. The sample freight will be returned to customer account after we cooperate.

Q: How can I get your quotation as soon as possible?
A: The email and fax will be checked within 24 hours,meanwhile,Wechat and WhatsApp will be online in 24 hours. Please send us your requirement and order information,specification(Steel grade,size,quantity,destination port),we will work out a best price soon.

Q: Do you have any certifications?
A: Yes,that's what we guarantee to our clients. we have IS09000,IATF16949 certinicate,ISO 14001 certificates etc.Our products are of high quality and we have professional engineers and development team.

Q: What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipmenit or paid against copy of B/L within 5 working days. 100% Irrevocable L/C at sight is favorable payment term as well.

Q: Do you accept the third party inspection?
A: Yes absolutely we accept.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA