BOMCO F1300 F1600 Mud Pump Bi-metal Liner

The bi-metal liner combines the advantages of hot forged high wear outer sleeve and high chromium wear-resistant and corrosion-resistant inner sleeve.
The outer sleeve is formed by hot pressing of high-quality carbon steel and the inner sleeve is cast by centrifugal casting of high chromium cast iron.
The outer sleeve has a tensile strength of more than 900,000 psi, and the inner sleeve has a hardness of more than HRC62 after heat treatment, which can withstand 7,000 psi pressure. Its inner surface is smooth mirror, the inner hole size tolerance is strict, and the normal service life can reach more than 800 hours.
Brand | Model |
BOMCO | F-500,F-800,F-1000,F1300,F1600,FB-1300,FB-1600,D-375,D-700 |
LANSHI | 3NB-1300C,3NB-1000,3NB-1000C,3NB-800 |
QINGZHOU | SL3NB-1300A,QZ-1000,QZ-500,QZ-350,QZ-800,SL3NB-1600 |
HONGHUA | 3NB-1600F,HHF800/1000,HHF1300/1600,HHF1600HL,HHF2200HL |
DRILLMEC | 7TS450,7TS600,9T800,9T1000,10T1300,12T1600 |
EMSCO | F-500,F-800,F-1000,F1300,F1600,FB-1300,FB-1600,FC-1600,FC-2200 |
IDECO | T-500,T-800,T-1000,T-1300,T-1600 |
GARDNER DENVER | PZ-7,PZ-8,PZ-9,PZ-10,PZ-11 |
NATIONAL | 7-P-50,8-P-80,9-P-100,10-P-130,12-P-160,14-P-200,14-P-220,K-700,K-700A,K-500,K-500A |
OILWELL | A-350PT,A-560PT,A-600PT,A-850PT,A-1100P,A-1400PT,A-1700PT |
ELLIS WILLIAMS | W-440-LP,E-447,E-2200,W446,W440 |
RUSSIAN | 8T-650,UNBT-600,UNBT-950,UNBT-1180L,UNBT-950A,UBT-400,BT-600,UB-590,UNB-600,8T-310 |
1. Preparation
Clean the installation area: remove dirt, carbon deposits and impurities inside the liner body, and ensure that the installation surface is clean and flat.
Inspect the liner body: Check whether the liner body has cracks, wear or other damage. If there is a problem, repair it first.
Prepare tools: Prepare appropriate installation tools as needed, such as press-fitting tools, wrenches, etc.
2. Apply lubricant
Apply an appropriate amount of lubricating oil or grease to the outer surface of the cylinder liner to reduce friction and resistance during installation.
3. Install the cylinder liner
Carefully place the ceramic cylinder liner into the installation position of the cylinder body, ensuring that the direction of the cylinder liner is correct.
Use the press-fitting tool, apply pressure evenly, and slowly press the cylinder liner into the liner body until the cylinder liner is installed in place. Pay attention to keeping the cylinder liner vertical and horizontal during the press-fitting process to avoid tilting or jamming.
4. Check the installation position
After installation, check whether the cylinder liner is in full contact with the bottom of the cylinder liner and whether the top of the cylinder liner is flush with the plane of the cylinder body.
5. Subsequent processing
After installation, clean the excess lubricant around the cylinder liner and cylinder body.
It should be noted that different types and specifications of ceramic cylinder liners may have different installation methods and requirements. Before installation, be sure to refer to the relevant installation instructions and technical specifications, and seek help from technicians when necessary.




1.How do you transport the goods?
We transport the goods by container. we possesses long term cooperation with ship agency which can provide you lowest shipping fee. For samples we can send by express.2.Can you satisfy my special requirement?
Definitely! we have strong design capacity and R&D capacity!
3.Which shipment terms can you accept?
EXW FOB CNF CIF DDU DDP