2 3/8" 8 1/2" API Oilfield Casing Drill Pipe Ddz Ta Mg Elevator

Price $3000.00 Compare
Min Order 1 Set
Shipping From Shandong, China
Popularity 264 people viewed
Quantity
+-
 

Shandong Seaco Machinery Equipment Co., Ltd.

VIP   Audited Supplier 5 years
Profile Certified by SGS/BV
2 3/8" 3 1/2" API
Online
12month
Forging
Spray-Paint
High Pressure
High Manganese Steel, Tungsten Carbide
35CrMo AISI 4140 G105
Forging
Ta 65 Ta 100 Ta150
2 3/8"-4 1/2" 5"
Red
SEACO
Standard Export Package
2 3/8 2 7/8 3 1/2
Shandon China
84314310
Product Description

2 3/8" 8 1/2" API Oilfield Casing Drill pipe DDZ TA MG Elevator
2 3/8"  3 1/2" API Oilfield Casing TA Elevator 100 Ton for Rig handling tool
TA type 300 ton API oilfield casing Elevator manufacturer

API oilfield casing Elevator manufacturer

Product Description

2 3/8" 8 1/2" API Oilfield Casing Drill pipe DDZ TA MG Elevator
2 3/8"  3 1/2" API Oilfield Casing TA Elevator 100 Ton for Rig handling tool


Features:

 

TA type 300 ton API oilfield casing Elevator manufacturer

 

 

The elevators are hoisting tools for handling 90 shoulder drill pipe, casing, tubing and drill collar in oilfield.

 

The elevators is according to API SPEC 8A standard.
2 3/8" 8 1/2" API Oilfield Casing Drill pipe DDZ TA MG Elevator

 

ModelSize(in)Rated Cap.Remark
 DDZ-100 2 3/8- 5 100 MG
 DDZ-150 2 3/8- 5 1/2 150 RG
 DDZ-250 2 3/8- 5 1/2 250 MGG
 DDZ-350 3 1/2- 5 7/8 350 GG
 DDZ-350TD 3 1/2- 5 7/8 350 For Top Drive
 DDZ-500 3 1/2- 6 5/8 500 HGG
 DDZ-500TD 3 1/2- 6 5/8 500 For Top Drive
 DDZ-750 4- 6 5/8 750 

 

Detailed Photos

FAQ

 

FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA