2000L 3000L 5000L Commercial Craft Beer Industrial Brewery Equipment
METO Beer Brewery Equipment is made of high-quality SUS304 stainless steel and can be customized
according to customer's requirements and budget with standard configuration & high configuration.
2000L Micro Beer Brewery Equipment (For Reference) | |
Brew House System
| Mash, Lauter tun, brew kettle/whirlpool tank, hot liquid tank |
Inner wall: 4mm SUS 304; outer wall: brushed SUS 304; insulation: 100mm PU; inside polishing 0.4um dome top with manhole; rotating CIP washing ball; thermowell for temperature sensor and thermometer | |
Fermentation System
| Beer fermenter tank |
Inner wall: 4mm SUS 304; cladding thickness 3mm,outer wall: brushed SUS 304; insulation: 100mm PU; inside polishing 0.4um dome top with conical bottom; rotating CIP washing ball; thermowell for temperature sensor and thermometer; pressure sensor and gauge | |
Cooling System
| Glycol cooling tank |
power supply, temperature display centrally, brewhouse manual control, fermentation tanks separate control with digital controller separately variable frequency control for motors, pumps, etc. | |
CIP Washing System
| Sanitizer Tank effective capacity 200L, interior & exterior 2b finish, welding seams brushed, associated valves and fittings |
Caustic Tank effective capacity 200L, interior & exterior 2b finish, welding seams brushed, associated valves and fittings, electric heating elements | |
Control system | DCS semiautomatic or PLC automatic control system |
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.

2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.