200m3 500m3 SMC FRP Modular Bolted Water storage Tank for rainwater tank
Product Name | Stainless steel water tank | |||
Product Material | SUS201,SUS304,SUS316,SUS444 | |||
Use | Drinking water storage (SUS304/316/444)Fire water tank (SUS201/304) Rainwater collection Agricultural irrigation water tanks Hot and cold water storage Other liquid storage (please consult engineer)) | |||
Plate specifications | 1000*1000mm,1000*500mm,500*500mm | |||
capacity | Customized according to customer needs | |||
Other customization | Insulation layer, water supply equipment | |||
Installation method | TIG welding | |||
Installation Environment | Ground, rooftop, outdoor | |||
Service life | 30 years | |||
Product Benefits | Corrosion-resistant, rust-free, easy to clean, light weight, high structural strength, environmentally friendly and recyclable. |
Advantages of Stainless steel water tank
1. Food grade material, no pollution to water quality.
3. Light weight, high strength, not easy to deform, not easy to break.
4. It is resistant to high temperatures, not easy to age, and has a longer service life than other materials.
5. The surface is smooth and beautiful, easy to clean.
6. The construction cycle is short and can be quickly installed and put into use.
7. It is environmentally friendly and pollution-free, and the materials can be recycled twice. It is estimated that 60% of the material cost can be recovered.





1). Potable Water Storage (drinking water).2). Rainwater Harvesting & Storage.
3). Emergency Water Storage.
4). Pump Chambers.
5). Effluent/Acid and alkali solution treatment & Storage.
6). Hospital, buildings, building site, school and other place.
1. After getting a permit to install on a particular site, ensure you have all the required equipment.
2.They should be free of damage to prevent a substandard finish.
3. Check that the area of installation is level.
4. Assemble the beams horizontally on the foundation or steel tower to form the skid base.
5. Install the bottom panel carefully on the skid base.Install the side panels. Once the side panels are in place, you can put up the panel partitions.
6. The panels should be joined using bolts and nuts, as per the manufacturer's recommendations.
7. Install the tie rods and stainless steel partitions to support the roof.
8. Assemble the top cover/roof.
9. Install internal and external stainless steel ladders.
10.Tie all stainless steel nuts and bolts with a washer.
After completing the installation and getting approval from a consultant, carry out a water leak test. Connect a temporary water supply pipe and let the water stay in for at least 24 hours. Make sure you have enough air vents. If there are any leakages after the test period, rectify and seek approval.
1. Q: Are you Trading Company or Manufacturing Factory?
A: We are both manufacturer trading and company. We have our own factory for almost five years, and we have better service of overseas customers. Welcome to send your inquiry!
2. Q: I am interested in your products, could I get sample for free?
A: We can supply a few pieces FREE samples if we have some in stock, and you only need to pay the freight cost by yourself. Welcome to send your inquiry for FREE samples!
3. Q: How about the Delivery time?
A: 10-15days after receiving the deposit based on the MOQ. Normally, 30-35days to finish the order for a 20ft
container. Welcome to ask for the detailed delivery time according to your order quantity!
4. Q: How can you guarantee the product quality?
A: We have the quality control system ISO9001:2015, and it's been followed strictly. We also have the professional QC team, and each our package worker will be in charge of the final inspection according to the QC instruction before packing.
5. Q: What is about the payment terms.
A: Basically, the payment terms are T/T, Western Union, Alipay.
6. Q: Can you do OEM for me?
A: We accept all OEM orders,just contact us and give me your design,we will offer you a reasonable price ASAP.