200mm HDPE/PP/PVC Pipes Hydraulic Butt Fusion Welding Machine

Price $1200.00 Compare
Min Order 1 unit
Shipping From Zhejiang, China
Popularity 441 people viewed
Quantity
+-
 

Zhejiang Huajin Welding Machine Equipment Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
200mm
200mm
Air Cooling
Semi-Automatic
Intermediate Frequency
AC
Hot Melting
3.25kw
50-60Hz
220V
117kg
Huajin
Plywood Cases
200
China
8515290000
Product Description

Application& Features:

1.Consist of basic frame, milling cutter, heating plate, hydraulic unit, support.
2.Working environment must be between -40ºC~40ºC.
3.Pressure adjustable range: 0-6Mpa.
4.Heating plate Max. temperture: 270ºC.
5.Suitable for material of PE, PP, PVDF.

 
ModelHDC200
 Pipe size(mm)  63mm,75mm,90mm,110mm,125mm,140mm,160mm,180mm,200mm 
 Heating plat Max temp  270ºC 
 Temp deviation in surface(170-250)  ±5ºC 
 Max tolerance of welding jointing  0.3MM 
 Max working pressure hydraulic station  6Mpa 
 Working voltage  220V 
 Working frequency  50-60HZ 
 Motor power/voltage of hydraulic station  0.75KW / 220V 
 Power/voltage of heating plate  1.6KW / 220V 
 Power/voltage of planning tool motor  0.9KW / 220V 
 Total Power  3.25KW 
 Overall weight of machine(kg)  117KGS 
 

Machine Real Shot

Company Profile

OUR MACHINES

EXHIBITION

Product Parameters


P1: Approach and preheating pressure,
P2: Maximum heating pressure,
P5: Welding pressure,
Pt (Drag pressure): pressure necessary to overcome the friction of the machine. It must be measured by the operator 
with the pressure gauge of the hydraulic unit.

t1, t2, …, t5: duration of phases 1,2, …, 5.

1- Approach and Preheating Phase. Bring the edges to be welded closer with the thermal element at 
the pressure (P1+Pt) so that the edge reaches the dimension provided for by the standard used.

2- Heating Phase. Reduce the pressure to the maximum value P2, sufficient to maintain contact of the edges of the 
pipe with the thermal element, for the time t2

Note: The operator, by reducing the pressure, must be careful not to detach the edges from the thermal element. If 
this happens, the welding must be repeated.

3- Phase of Extraction of the thermal element. Remove the thermal element at the maximum time t3, without damaging the edges of the two elements to be welded.

4- Phase of reaching the welding pressure. Put the edges in contact, progressively increasing the pressure up to the value (P5+Pt), in time t4. Prevent the soft material from coming out of the surfaces that were approached.

5- Welding Phase. Keep the edges in contact under pressure (P5+Pt ) for time t5.

Do not use water or compressed air to accelerate the cooling of the fusion. If necessary, protect the weld from 
rain, wind or excessive solar radiation.


Certifications

 

FAQ

Q: Are you manufacturer or trading company?
A: We are Manufacturer with more than 10 years foreign trade experience. We have our own factory.
Q: How long is the delivery time ?
A: Depend on the quantity. 

Q: What is your payment term?
A: Sample order :must be 100% in advance by T/T. 
Bulk order :T/T ,30%deposit,70%against copy of B/L. deposit,70%against copy of B/L.

Q: Could i use my own brand ?
A: Yes ,welcome.

Q: Could you provide the after-sale service for the clients after buying your products ?
A: Yes, of course .we supply 24h after-sales service. after delivery, we will track the products for you once every two days,until you get the products. when you got the goods,test them,and give us a feedback. if you have any questions about the problem,contact with us, we will offer the solve way for you.

Q: Do you test all your products before delivery ?
A:Yes,all the products have to pass strict inspection before they go out !

Q: Can you produce base on our drawing &sample ?We may also need our logo on it ?
A :Yes,of course. we do OEM&ODM service. and definitely you can have logo on it.

After Sales Service

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA