





Forklift Pocket Dimensions | ||
Width | 360 | MM |
Height | 115 | MM |
Center Distance | 2050 | MM |
Ratings | ||
Max. Gross Weight | 30480 | KGS |
Tare Weight | 2400 | KGS |
Tare Weight (incl. Unit: 540kg) | 2940 | KGS |
Max. Payload | 27540 | KGS |
Cargo access height | 2221 | MM |
Insulation | ||
Roof | 80 | MM |
Side walls | 60 | MM |
Door panels | 74 | MM |
Floor | 76/112 | MM |
Heat leakage value | Umax = 21 kcal / deg.c.hr. at the mean wall temperature 293K (20 ºC) (including reefer unit.) | |
Max. air leakage value | Qmax = 5 m3/hr. (incl. Reefer unit max. 0.5m3/h) measured at 250±10Pa |
1. If you have cargo to load in China with containers:
You can directly pick up reefer containers from our yard, load your goods at the factory, and arrange for delivery to the port.
This streamlined process minimizes both time and costs, providing the most efficient solution for your logistics needs.
2. Shipping empty reefer containers:
If you require empty reefer containers, we can ship them as Shipper-Owned Containers (SOC) via container vessel. Space reservations can be made based on the container's picture, CSC plate, and certification.
3. Production Lead Time and Delivery:
The production lead time depends on your order quantity. For orders of fewer than 10 units, we can manufacture and deliver within 4 weeks. For larger quantities, additional production time will be required to fulfill your order.


Q:Are the containers all brand new?
A: Yes, the containers are all brand new but we still provide used containers for sale.
Q: What size of containers do you have?
A: We have many different sizes to choose, such as some general size like 4ft, 5ft, 6ft, 8ft, 10ft, 15ft, 20ft,40ft and other special size containers you can order.
Q: Can I change the color and logo?
A: Yes, we provide customization service. You can put your logo on the container and change the color that you want.
Q: What service do you provide?
A: We provide professional before and after sale service, also we do have online technical service.
Q: How long do you need to produce?
A: Normally we need 30-40 days at least. The exactly time depend on how many containers do you needs.