Kraft paper Cement bag, Valve Bag making machine
This machine is a professional kraft paper bag making machine for cement bag chemical bag Sack bag making.
It can make 2-4 papers+ PE, 5layers bags.
The whole machine consists of Tuber Machine and Bottomer machine .
Machine | Picture | Configuration |
Tuber | ![]() | Tuber ZT1962S |
4-color Servo Printing Machine | ||
Add - Straight cutter | ||
Add M edge Mechanism | ||
Intermittent Venting Mechanism (Part) | ||
Bottomer | ![]() | Bottomer GU8320 |
Inner Reinforcement |
Bottomer | ![]() | Bottomer HD8916 |
HDE012 External Reinforcement | ||
HDK001 External Strengthen Paper 2 color Printer |
Tuber machin
Stepped cut, tube length (mm) | 500-1100 |
Straight cut, tube length(mm) | 500-1100 |
A-shaped edge,width (mm) | 370-620 |
cut | Straight+stepped |
Layers | 2-4papers+1 pe |
Top speed tubes/min | 150(tube length:780-820) |
Normal speed tubes/min | 120-140 |
Max paper reel diameter(mm) | 1300 |
Size of the machine(m) | 28.72*2.38*2.875 |
Power | 35W |

H-Speed Bottomer Machine

Tube length | 470-1100 mm |
Fished bag length (L) | 330-920 mm |
Bag Width (W) | 330-600 mm |
Bottomer width (D) | 90-200 |
bag Center Distance (L-D) | 250-800 mm |
Valve paper length | 80-420mm |
The max design speed | 230 bags/min |
Normal production running Speed | 200 bags/min |
Power | 86 kw |
Machine size | 32.63*5.1*2.52 m |

Bottomer Machine HD8916
Bag Length(mm) | 370-770 |
Bag Width(mm) | 350-550 |
Bottom Width(mm) | 90-150 |
bag Center Distance(mm) | 280-620 |
Flake Valve Length(mm) | 120-250 |
External Reinforcement Length(mm) | 260-380 |
Vacuum pump suction rate | 250m3/h |
Vacuum Pump Vacuum Degree | -80kPa |
Max Speed | 150 bags/min |





1) What is the suitable material for your machines?
Kraft paper , and PE film . 2~4 layer papers , 1 film, up to 5 layers
2) How many years of your factory?
Our factory since 1983.focus on the kraft paper cement bag making product line , include Tubmer machine & Botttomer machine . have more than 114 Patents of machine . Export business is 70%,More than 20 countries
3)Lead times and shipment :
3~4months for standard machines. Tuber machine 2*40HQ, Bottomer machine 3*40HQ , Total: 5*40HQ
4)Install and Trainning :
2~4 Enginners 15-20days , and trainning 25days.
5) Where is your factory? How can i visit your company?
Our factory is located in Guangzhou, Guangdong Province, China. Nearly HK and the Guangzhou Baiyun International Airport. warmly welcomed to visit us.