MT-2000L
5 Years for Tank
Water,Malt,Hops,Yeast
Beer
Customized
CE, ISO9001, TUV
Electric Steam,Gas,Direct Fire
Semi-Automatic
SUS304 Stainless Steel
Inner Wallet 3mm, Outer Wallet 2mm
220V/380V/Adjustable
Depending on Capacity
Depending on Capacity
Arc Argon Protection
up to CE UL Standard
Steam Jacket , Electric Electric Tube, Direct Fire
Double Wallet with Dimple Cooling Jacket
Chiller with Glycol Tank
Temp. Controller, HMI, PLC or Touching Screen
0.4-0.6um
Offer Auto CAD and 3D Design Drawing
2000L Beer Brewing Equipment
METO
Plastic Film, Plywood Case; Container;
Customized
Jinan, China
84384000
Product Description
Medium Scale 2000 Liter 3 Vessels Craft Micro Beer Brewing System
Brewing System | Components | Capacity | Specification |
Grinding System | Miller | 500KG/H | Double Roller,Noise<60db |
Brewhouse System | Mash/Lauter tun | 2000L | Mashing Process:Decoction.Infusion.Multi-step infusion Interior:2.5-3mm Exteior:3-4mm |
Brew Kettle/ Whirlpool Tank | 2000L | ||
Fermentation System | Fermentation Tank | 2000L/4000L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Cooling System | Glycol Water tank | 4000l | Equiped with PU level indicator |
Cooling machinery | 7P*2 | ||
Cleaning System | Disinfection Tank | 150L | SUS304 full welded |
Alkali Tank | 150L | ||
Pump | 3T/h | ||
Control System | Control Cabinet | Manual/PLC/ HMI | Manual/Semi-automatic/Automatic |
Optional | Auger System | ||
Grain Case | |||
Grist Hydrator | |||
Piping flow panel for Brewhouse | |||
Brewhouse Separate PLC Controller | |||
Customized |

1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.
METO is a professional manufacturer of beer brewing equipment. We mainly have the following kinds of
equipment: including 100L, 200L, 300L, 500L, 1000L, 2000L etc. We can produce the equipment according
to our clients' requirements.
1. What Certificate do you have for your beer brewing equipment?
We can offer CE, PED, UL certificate.
2. Mashing system can be controlled automatically?
Yes. You can input your recipe into the control cabinet, then it can be finished automatically.
3. Your brewery equipment has hops back?
Yes, we install hops back for all our brewery equipment.
4. What is pressure of fermentation tank?
0.15Mpa for fermentation, 0.3Mpa at most---------
5. What is delivery time?
40 working days.
6. Can I visit your factory?
Yes, you are warmly welcome to visit us at any time. We will treat you with our beer.