MC-0002
Clay Dry Sand
Vacuum Aspirated Casting
Sodium Silicate Sand Core
Machinery Parts
CNC Machining
Steel
Sand Blast
Ra3.2
DIN
CE, RoHS, ISO 9001:2000, ISO 9001:2008
Steel
Horizontal
Dia Casting
Grade 2
Copper Alloy
CNC Machine
QMMC
According to Requirement
500x150x70mm
Qingdao China
7616991090
Product Description
OEM customized resin coated sand casting of nodular cast iron , ductile iron sand casting, coated sand steel casting factory







Material | Aluminum alloy ADC12, ADC10, A360, A380, A356 |
Magnesium alloy AZ91D, AM60B | |
Zinc alloy ZA3#,ZA5#,ZA8# | |
Processing Craft | Drawings→ mould making → die casting →rough machining → CNC machining →surface treatment →product checking→ packing →delivery |
Tolerance | ± 0.02mm |
Surface Treatment | Electroplating, Chrome Plating, Zinc Plating, Nickel plating, Electrophoresis, Anodization, Polishing, Powder coating, Sandblasting, Passivation, Spray painting, Etc. |
Quality Assurance | ISO9001:2015 Certified, SGS Certification |
Inspection | 1.Foundry in-house: 100% inspection on critical dimension; 100% on appea rance. |
2.Third Party inspection available upon requirement. | |
Mainly Testing Facility | Three-dimensional measuring instrument, Salt spray test box, Dynamic balance detector, Pneumatic detection |
Quality Guarantee | Two years |
Features & Advantage | 1.High machining accuracy, the flatness within 0.1mm. |
2.High finish appearance, smooth surface roughness is Ra1.6 after machining. | |
3.The machining precision is high and the assembly structure is seamless. | |
4.Smooth appearance, corrosion resistance. | |
5.Pass Salt Spray Test with 96 Hours. | |
Standard | 1.Aluminum alloy : ISO3522-84, ASTMB85-96, ASTMB597-98 |
2.Magnesium alloy : ISO/DIS16220-1999, ASTMB93/B93M-98,JISH2222-1991 | |
3.Zinc alloy: ISO301-1981, ASTMB86-98, ASTMB240-98, ASTMB327-98 |








FAQ
Q1.How to have my components quoted ?
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.