QMMC-MF0002
Yes
Within 2 Years
New
CE, ISO9001
DIN, ASTM, GOST, GB, JIS, ANSI, BS
Customized
Metal
Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery
Shaping Metal
Multistep Progressive Dies
0.02mm
Sea, Air, Express, EXW, Fob, CIF, DDU, DDP
QMMC
Cnt Box
according to drawings
China
7602000010
Product Description
One-Stop Service Custom Cheap Cnc customized center cnc machining service






















Material | aluminum 6061,copper , steel , brass ,Various plastic,stainless steel , aluminum alloy : 6061,6082,6063,7075 ,5052 ...etc |
Surface treatment service | 1.Bead Sandblasting |
2.Anodizing | |
3. Powder coating | |
4. Painting | |
5. Alodine / passivation | |
6. zinc plating | |
7. silk printing | |
8. Laser etching | |
9. Polishing | |
10. Chormed free finish | |
11.Chrome plating | |
CAPBILITIES | 1.CNC Milling |
2.CNC Turning | |
3.MOLD Making | |
4.Plastic Injection | |
5.DIE Casting | |
6.Carbon Fiber Parts Forming | |
7.Stamping | |
8. 5 axis cnc machining | |
SAMPLE TIME | 1. 3-10 days for machining parts |
2. 25- 35 Days for molding parts | |
Quality Control | We will provide test report and pics before shipping |
Test equipment | Cmm testing, Quadratic element measure. |






















FAQ
Q1.How to have my components quoted ?
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.
A1: Please contact us via TradeManager or Email and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.