CFBK500W
Power, Electronic
Single
Core-type Transformer
Nature-Type
Separated Winding Transformer
ISO9001
Single-phase Transformer
Power Frequency
OD
Thank
THANK, CF
Export Stard Packing
N. W5.5kgs
Jiangsu of China
8504319000
Product Description
0.5KW TRASFORMER CFBK500W TOROIDAL TRANSFORMER
Specification:
500W 100% COPPER WIRE ANNULAR TRANSFORMER
MODEL:CFBK500W-110V


1. PURE COPPER WIRE ANNULAR ISOLATING TRANSFORMER
2. WIRING METHOD:220VAC transform to110VAC
RED WIRE-Input 220VAC
BLUE WIRE-Output 0-110VAC 4.5A
Model | Power (w) | Dimension (Dia x H mm) | Weight (kgs) | Packing (pcs/ctn) |
CFBK500W | 500 | 130*70 | 5.50 | 4 |
Product Parameters:

Power: | 500W |
Input: | 220V AC |
Output: | 110VAC |
Insulation: | Class B |
Operating Temprature: | 25-40ºC |
Accessories: | Screw 1 set, Metal Plate 2pcs, Rubber Pad 2pcs |
Material | Iron Core + Insulating film +Copper Wire |
Packing:
Hard cardboard or wooden box with foam inside.


Shipping:
Normally the delivery time is within 10 days according to customer's choice or ship by the best express company to the destination.
Delivery:
1.with over 17 years of manufacturing experience, any type of customizing is available.
2.with perfect service system, we can provide you with first class pre and after sale service.
3.we have enough storage of each type of products, with first class packaging and shipping, make sure accurate delivery.
4.professional sales consultants give you all answers about our proucts.
Certificate:
Question1: What is your service time:
Answer: 24 hours online service. Email will be replied within 12 hours.
Question2: What about your products' warranty?
Answer: 1 year. For sea orders, the warranty is 15 months.
Question3: Do you have any certificate?
Answer: Yes we have. Our factory passed ISO9001 and SGS verified. All motors have been approved by CE.
Question4: Do you offer ODM and OEM Service?
Answer: Yes. ODM products according to customized design and specification as well as OEM products.
Question5: What is the delivery time?
Answer: For samples, 10-30 days according to the differnet produced difficulty. For bulk, normally 20-30 days. For customized order, the delivery can be negotiated.