PDC 5in 6in 7in 8in 9in10in Drill Bit for Water Well

Price $100.00 Compare
Min Order 1 Piece
Shipping From Hebei, China
Popularity 262 people viewed
Quantity
+-
 

Hejian Tianrun Machinery Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
drilling bit
Customized
API
Jobber-length
Twist Drill Bit
Solid Carbide
Well Drilling
Custmized
3
Customized
Customized
tianrun
Wooden Box
140*140*200
China
82071910
Product Description
Company Profile



 
Product Parameters
 
Product Name
PDC Drag Drill Bit
Bit type
Drag , three wings, four wings
Size
98mm,108mm,114mm,120mm,127mm,133mm,140mm,149mm,152mm,158mm,165mm,
171mm,177mm,190mm,200mm,216mm etc.
Color
Gold, Grey, or Customized
Applicable fields
Rock drilling, Water well, Oil/Gas Coal mining drill bit etc.
  

PDC Drill Bit

PDC Drilling bit is made by PDC cutters brazed to Steel Body or casing steel body. The PDC cutter has high hardness, abrasion resistance and toughness, the PDC Drag Drilling bit life is 20-40 times, and the drilling efficiency is 50% higher of tungsten carbide drill bit.
Application 


PDC Drag bit is applied to rock formation f below 12, like sandstone, mudstone, etc., it is mainly used for Coal mining ,water well, geothermal well, geological exploration, borehole, gas drainage hole, discharge water hole, blast hole,etc.
 
Our Advantages
1.High density (low porosity)
2.High uniformity of composition and structure
3.Excellent adhesion between diamond particles
4.High wear resistance
5.High impact resistance
6.High thermal stability
7.Optimized interface between diamond and tungsten carbide layer for excellent bonding



FAQ

1.Why choose us ?
We have rich experience in this industry for many
years.Now our products are serving around the world.we have High Quality, Competitive Price, and Fast Shipment.

2.Do you offer any custom designs?
Yes,we have our own trade factory. We provide services to top range partners.Produce a superior product for you by your designs.

3.How To Order ?
Step 1, please tell us what model and quantity you need;
Step 2, then we will make a PI for you to confirm the order details;
Step 3, when we confirmed everything, can arrange the payment;
Step 4, finally we deliver the goods within the stipulated time.

4. When will make delivery ?
About 7 work days after receipt of the payment.

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA