Used for Pouring Reinforced Concrete in Building Platform Fomwork Construction Steel Formwork

Price $740.00 Compare
Min Order 10 Tons
Shipping From Zhejiang, China
Popularity 348 people viewed
Quantity
+-
 

Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
High or low pile bearing platform, customized
Technical Assistance on-Line
1 Year
ISO, CE
Steel
Base Formwork
Zhongtai Formwork
Bearing Platform Formwork
Red, Blue
Spray Painted
Ton
Technical Assistance on-Line
Bundling
Zhongtai formwork
Standard Sea-Transport Packing
High or low pile bearing platform, customized
Shandong China
7308400000
Product Description

Product Description

MeaningIt is a kind of steel formwork used for pouring reinforced concrete, foundation bearing platform and foundation beam joint supporting mould, whole cast-in-place.
MaterialQ235b,5+1 composite plate,201 stainless steel
TypeHigh pile bearing platform, low pile bearing platform
AdvantagesStable and reliable, tight joints, easy dismantling, high re-use rate
UsageBuilding, harbor, wharf, marine engineering and bridge engineering


 

Detailed Photos


Company Profile

                Zhongtai steel formwork                                Process Manufacturing lssues


Zhongtai South China Heavy Industry (Hangzhou) Co., Ltd. is a comprehensive enterprise integrating steel formwork product design, production, leasing, sales and service, providing one-stop purchase of flat formwork, cantilever hanging basket formwork, cylindrical formwork, cap and other steel formwork.

The company's products are widely used in the construction of bridges, roads, railways, subways, integrated pipe corridors, power stations, airports, water conservancy, tunnels and other engineering projects.


FAQ

1.Are you a trading company or a manufacturer?
 We are an industry-trade company.

2.What do you do?
We design and manufacture formwork and scaffolding products for concretestructure pouring in engineering projects such as bridges, highways, railways.subways, comprehensive pipe galleries, power stations, airports, waterconservancy,tunnels,etc.

3.How long is the delivery(production) and shipping time?
If the goods are in stock, we will arrange shipment within 3-5 days after receivingyour down payment. lf the goods are out of stock, they will be determined based onthe quantity.

4.Why do you buy from us instead of other suppliers?
1. Professional team, 12 years of market experience;
2. Own source factory supply, production capacity of 300,000 tons/year;
3. One-stop service center to meet all steel formwork needs;;
4. 24-hour online service

5.How to confirm payment?
1. T/T: 30% T/T of the advance deposit and 70% T/T of the balance before delivery;
2.Letter of Credit:100% irrevocable letter of credit

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA