4130000977
Yes
1 Year
ECU Controller
Lgmg Lifts
CE
New
ECU Controller
Lgmg Lifts
Lgmg
4130000977
Used for Aerial Work Platform
High Performance
Enough
0.600 Kg
HNARL
Standard Export Packing
25X25X5 cm
China
Product Description

HNARL Construction Machinery Parts Electronic Controller 4130000977 LGMG Scissor Lift ECU Controller
Technical parameters: | ||||
Brand: | Aerial Power Parts | |||
Part No.: | 4130000977 | |||
ECU: | IP66(front panel) | |||
Working voltage: | 9~32V | |||
Working temperature range : | - 30 ºC ~ + 80 ºC | |||
The interface is protected by short circuit or wrong connection | ||||
This ECU IS 100% compatible with LGMG Hydraulic driving version,and it uses Anti-corrosion paint also . |
Products Description
Technical parameters: | ||||
Brand: | Aerial Power Parts | |||
Part No.: | 4130000977 | |||
ECU: | IP66(front panel) | |||
Working voltage: | 9~32V | |||
Working temperature range : | - 30 ºC ~ + 80 ºC | |||
The interface is protected by short circuit or wrong connection | ||||
This ECU IS 100% compatible with LGMG Hydraulic driving version,and it uses Anti-corrosion paint also . |



With the advantage of global resourcing and one-stop purchasing
10,000+ kinds of parts for your choose, and 200,000+ stock on warehouse
If you look for one reliable supplier to get a wide range of spare parts
If you need professional help
If you want more competitive pricing and superior quality
Feel free to contact Aerial-Power team.

10,000+ kinds of parts for your choose, and 200,000+ stock on warehouse
If you look for one reliable supplier to get a wide range of spare parts
If you need professional help
If you want more competitive pricing and superior quality
Feel free to contact Aerial-Power team.


Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.