Japan Steel Structure/Prefab Steel Structure Hangar/Steel Frame/Steel Building/Steel Shed/Steel Construction/Prefab Shed for Equipment Machine with Painting

Price $69.00 Compare
Min Order 500 Pieces
Shipping From Shandong, China
Popularity 447 people viewed
Quantity
+-
 

Qingdao Cosmo Technology Co., Ltd

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
COSMO-SS
Bolt Connection
Q235, Q345 Welded H Section Steel
Q235, Q345 Welded H Section Steel
Q235 C and Z Purlin
EPS/Glass Wool/Rock Wool/PU Sandwich Panel
Sandwich Panel or Corrugated Steel Sheet
Aluminum Alloy Window/ PVC Window/Skylight
Sliding Sandwich Panel Door/Rolling Metal Door
12 Grades
8 Grades
up to 50 Years
Suitable Temperature -50ºC~+50ºC
Optional as Client Request
Painted or Galvanized
Bending, Welding, Decoiling, Cutting, Punching
Steel Building, Steel Structure Hangar and Garage
H-Section Steel
GB, ASTM, DIN, JIS, AISI, BS
Carbon Structural Steel
Steel Beam
Fire-Resistent Steel
Q235
Wall Support
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Online Technical Instruction
1 Year
Cold-Rolled Steel
COSMO
Sea Standard Packing or Customized
Customized
Shandong, China
730890000
Product Description

Qingdao COSMO steel structure Hangar and Garage has features of high fire resistance, strong corrosion resistance. Steel structure workshop/warehouse/hangar etc is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.

 

The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. Composite panel for roof and wall can also be used in our system such as polystyrene, glass fiber, rock wool, polyurethane sandwich panel which have good thermal insulation, heat insulation, fire-retardant performace. The wall of the steel structure maintenance also can use brick wall.
 

Specification of Steel Structure
ITEMS SPECIFICATION
Main Steel FrameColumQ235,Q345 Welded H Section Steel
BeamQ235,Q345 Welded H Section Steel
Secondary FramePurlinQ235 C and Z purlin
Knee braceQ235 Angle Steel
Tie RodQ235 Circular Steel Pipe
BraceQ235 Round Bar
Vertical and Horizontal SupportQ235 Angle Steel, Round Bar or Steel Pipe
Maintenance SystemRoof  SystemRoof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories
Wall SystemWall Panel (Sandwich Panel or Corrugated Steel Sheet
Window SystemAluminum Alloy Window/ PVC Window/Skylight
Door SystemSliding Sandwich Panel Door/Rolling Metal Door/PVC Door
OthersPVC Rainspout,Gutter etc
Wind Resisitance Grace12 Grades
Earthquake-resistance8 Grades
Structure life spanUp to 50 years
TemperatureSuitable temperature -50ºC~+50ºC
CertificationCE, SGS, ISO9001:2015, ISO 14001:2015
Finishing OptionsVast array of colors and textures available
Paint OptionsAlkyd painting, two primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized.

Projects

Main Components

Steel Structure Workshop, Prefabricated Steel Structure Building:
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO: 9001: 2008
3. Cost considering: Time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.


Packing and Delivery


COSMO packs the steel structure components by steel structure frame. When we load the goods,we can load it as a complete structure. In this way, we do not have to use 40 OT container. We can use 40HQ container,saving freight greatly.The loading time for 1 container only takes 30 minutes.In one day, we can load 20 containers easily.We can ship 1000 Tons in one shipment schedule.


Workshop

Customer from all over the world

MGO Board Directly Movable Prefabricated /Prefab/ Prefabricated House Container Luxury Poultry Portable Container House/Small House/Tiny House for Labor CampMGO Board Directly Movable Prefabricated /Prefab/ Prefabricated House Container Luxury Poultry Portable Container House/Small House/Tiny House for Labor Camp
Our company

COSMO is located in Qingdao city, China. The containers are decorated for different use, like, office, sports goods store and coffee bar etc. All materials, decoration schemes and installation are customized according to customer's requirements. With more than 15 years of international project operation experience and technology reserve, COSMO has formed a perfect one-stop systematic solution service capacity in steel structure construction industry, pharmaceutical manufacturing industry,medical care service,electronic and biotech industry, serving customers from more than 50 countries and regions in the world. COSMO business scope covers project consultancy, design, R&D, delivery and construction.

FAQ

1.Common type of the industrial building?

Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. 
Other 
types also could be designed and manufacturer as per clients' request.

2.What's the quality grade of the steel structure components?

Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. 

3.How about the delivery time?

Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication quantity.

4.How about the derust grade?

Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure.

5.What kind panel used for the roof and wall? 

Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well 
on the heat insulation,sound insulation.Common sandwich materials are EPS,
glass wool and PU.

6.How to install it?

Reply: We will furnish you the detailed construction drawing and the construction manual which could
help you to erect and install the building step by step. We also could send the 
engineer to your local to help you if needed.

7.Maintenance:

Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months.

So the surface will stay more time.  

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA