24/410 Injection Plastic Cap Mould Flip Top Cap Injection Plastic Mold

Price $4000.00 Compare
Min Order 4 Cav
Shipping From Zhejiang, China
Popularity 220 people viewed
Quantity
+-
 

TAIZHOU HUANGYAN DAELONG MOLD CO., LTD.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
Flip top cap mould
Injection Mould
Heat Treatment
Multi Cavity
PP
Compound Die
Household Appliances, Commodity, Home Use, Daily Cosmetic Product
Hot Runner / Cold Runner
UG
Fixed
CE, SGS
DME
Customized
Bottle Cap Mold
DAELONG
Wooden Package
600*500*550
Taizhou Zhejiang China
848071
Product Description
Product name24/410 flip top cap mold
Cavity numberCustomer's requirement (range from 4-24 cavities)
Mold structureHot runner or cold runner with inner closing system
Mold core/cavity steelS136,M310,W302,8407,SKD61 
Product materialPP
Delivery time70-80 days after confirmed mold drawing and product drawing
Life time3,000,000 shots
PackageStandard package for oversea




MOULD MANUFACTURE PROCESS

Cap mould: grinding--fly cutter--CNC Milling --Drilling --Lathe --Boring lathe --electric pulse --Finishing CNC -- EDM --Polishing --Installing -- Testing

BUSINESS STEPS

1. R&D We support customers R&D. We will make the files or improve the design if you need
2. Quotation  Making mould quotation will be finished in 1 or 2 days according to the drawing & sample which you supplied.
3. Negotiation   The negotiation includes quality, price, material,delivery time,payment term,ect.
4. Mould Design  We need to spend 3-5 days on mould and product 3D/2D drawing design.
5. Mould  We will build the mould based on customers's requirements. Before making the mold, we will send mold design to the customers for approval firstly.
6. Mould Testing  When mold is finish, we will test the mold to check if the product will be satisfied with customer's requirements, and we will send samples to the customers for approval.
7. Delivery   We will delivery the goods to the customers either by sea or by air.



FAQ

Q: What is your trade term? 
A: Normally FOB Ningbo or Shanghai 
Q: What is your payment term?
A: 30% down payment against PO, 70% balance payment before the shipment.
Q: What is your delivery time?
A: Normally in 55-65 days , depend on the mold structure.


IF YOU WANT TO KNOW MORE INFO, PLEASE CONTACT ME.

Steven Rao
TAIZHOU HUANGYAN DAELONG MOLD CO.,LTD
 
 


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA