External Joiner Sleeve Coupler Pipe Clamp Scaffolding Coupler Scaffold Clamp

Price $3.00 Compare
Min Order 1000 Pieces
Shipping From Shandong, China
Popularity 296 people viewed
Quantity
+-
 

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
SC003
Steel
Fixed
Multi-Pole Scaffolding
Combined Scaffolding
Projecting Scaffolding
Full Scaffolding
External Scaffolding
Attached Lifting Scaffolding
Scaffolding Couplers
Building Scaffold
En74/BS1139/As15
Electro Galvanizing
HDRL
Steel Pallet
Drop Forged Steel
China
730890
Product Description


INTRODUCTION:

The defining feature of Tube and Clamp Scaffolding is its versatility. You can use clamps to connect horizontal tubes and vertical tubes in unlimited combinations. Because of this adaptability, Tube and Clamp Scaffolding complement the ringlock scaffolding in many ways. Some of the more common applications include:

  • Joining Ringlock bays together
  • Creating building ties to suspend scaffold
  • Bracing Ringlock scaffolds
  • Closing gaps in platforms
  • Creating guardrails in tricky erections

TABLE OF PRODUCTS PARAMETERS:
 
Place of OriginChina
Brand NameHDRL
Size 48.3 /48.3
Material StandardEN74/BS1139/AS1576.2
Surface Treatmentelectro galvanizing /hot dipped galvanization/self-color
Packaging DetailPVC bags then on steel pallet 
Delivery Detail20-30 days after deposit.
Basic ComponentsDouble coupler, Swivel coupler, half swivel, putlog coupler, sleeve coupler, board retaining coupler,
Girder coupler, joint pin,etc.
manufacturingOEM&ODM

Scaffold Coupler / Pipe Clamp:
Item No.DescriptionSize         Weight (kgs)
SC001Double couplers48.3mm1.05
SC002Swivel couplers48.3mm1.15
SC003Half swivels48.3mm0.60
SC004putlog couplers48.3mm0.63
SC005Joint pins48.3mm1.00
SC006Sleeve couplers48.3mm1.10
SC007Girder Coupler48.3mm1.45

FACTORY PHOTOS:


PRODUCTS PHOTOS:










Q1: Are you a factory or trading company?   
A: We are a factory specializing in manufacturing all kinds of scaffolding material.

Q2: Where is the loading port?
A: Qingdao port or Tianjin port

Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.

Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.

Q5: Can I get some samples?   
A: Yes, Sample is free, but usually the customer will pay for the shipping cost. 

Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.

Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.

Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA