2p/3p/4p Enclosure 300 AMP DC Solar/Photovoltaic MCCB Circuit Breaker 250AMP for Batteries

Price $116.00 Compare
Min Order 1 Piece
Shipping From Zhejiang, China
Popularity 424 people viewed
Quantity
+-
 

Zhejiang Leidun Electric Co., Ltd

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
LDM9
High Voltage Circuit Breakers
Manual/Automatic
Normal Type Circuit Breaker
Air
Fixed, Fixed or Withdrawable
MCCB
Circuit Breaker
Conventional Circuit Breaker, Circuit-Breaker Failure Protection, Overcurrent Protection, OVP(Overvoltage Protection)
VDE, ISO9001-2000, CE, CB, CCC
DC 250V/500V/750V/1000V/1500V
125A-800A
2p/3p/4p
-35ºC~+75ºC
Lcs=100%Lcu
customizable
China
Product Description
  • Reliable Overload Protection: This product provides reliable overload protection for solar photovoltaic systems, ensuring the safe operation and longevity of the equipment.
 
  • High Breaking Capacity: This circuit breaker can effectively handle high-voltage applications, making it suitable for demanding solar power systems.
 
  • DC Voltage Rating: Rated for DC 1500V, this product is specifically designed for use in direct current (DC) systems, ideal for solar panel installations.
 
  • Durable Construction: This product boasts a sturdy build quality, ensuring a long lifespan and minimal maintenance requirements.
 
  • Compliance with Industry Standards: This circuit breaker meets industry standards for solar power systems, providing peace of mind for users and ensuring compliance with regulations.


Q1. Can I get samples?
Yes. If you have any needs, please contact us and we will respond within 24 hours. If you are in a hurry, you can call our sales directly 

Q2. Can I use other logos or designs on the products?
Yes, we provide OEM/ODM services, you can customize products with other logos and designs.

Q3. Do you have factories?
Yes, we have factories in Jiangsu and Zhejiang, welcome to visit our company.

Q4. How do you ensure quality?
We have a complete quality management system, use qualified raw materials, conduct quality inspections in different production links, regularly collect user feedback, and trace the source in time when quality problems occur, and keep records to prevent repeated errors.

Q5. How long does it take to prepare after placing an order?
Usually it takes 5~7 days, it also depends on the quantity of the order.

 
 
 
 
 
 
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA