CL2EDGVC-5.00/5.08
PCB
General
Push-Pull Connection
Rectangle
Welding Connection
Composite Electric Connector
Environmental Protection
Injection Molding
DVI
Ciliang
15days
Ok
100PCS
3.5mm, 5.0mm, 5.08mm
Ningbo or Shanghai Port
CL
OPP Bag+Carton+Pallet
5.00, 5.08mm
China
Product Description
2p to 24p Pitch 5.00 5.08mm PCB Connector Plug and Socket Pluggable Terminal blocks
MAIN FEATURES
TECHNICAL DATA
ITEMS
MOQ;100PCS
lead time:about 5-10 days
export port:ningbo or shanghai port
shippment terms:by sea or by air or by express
samples is free,freight collect.
best price with high quality
ENVIRONMENT
1. The EU's RoHS 2.0(Directive 2011/65/EU & EU 2015/863 )
2. SVHC(Substance of Very High Concern) of EU directive of the Regulation(EC) No.1907/2006(REACH).
PRODUCT PICTURES


DRAWING



MAIN CUSTOMER

FACTORY VIEW


SHIPPING & PAYMENT
--------------------------------------------------------------------
MAIN FEATURES
Pitch | 5.0mm/5.08mm |
Color | Green |
Poles | 2p-24p |
Pin arrangement | Single row in a straight line |
Installation Type | PCB Soldering |
Temperature rise | Low |
TECHNICAL DATA
Standard Data | UL Standard(UL1059) | IEC Standard(IEC61984) | ||||
UL application group | IEC overvoltage catepory/pollution degree | |||||
B | C | D | III/3 | III/2 | II/2 | |
Rated voltage | 300V | - | 300V | - | 320V | - |
Rated current | 15A | - | 10A | - | 20A | - |
Material | ||||||
Insulation Material | PA66 ,UL94V-0 | |||||
Material of Pin | copper alloy,Tin plated | |||||
Electronical Performation | ||||||
Contact Resistance | 20mΩ max | |||||
Insulation Resistance | 500MΩ at DC500V | |||||
Withstand voltage | 2KV for 1min | |||||
Ambient Conditions | ||||||
Operation temperature | -40ºC to +105ºC | |||||
Storage temperature | -40ºC to +70ºC | |||||
Shelf life | 1 year | |||||
Soldering capability | ||||||
Manual | 30W iron,320±5ºC,3S max | |||||
Wave soldering | 250±10ºC,5S max | |||||
Environmental Compliance | ||||||
RoHS2.0,REACH |
ITEMS
MOQ;100PCS
lead time:about 5-10 days
export port:ningbo or shanghai port
shippment terms:by sea or by air or by express
samples is free,freight collect.
best price with high quality
ENVIRONMENT
We hereby confirm that all the raw materials in our product including components, parts, materials and finished products are fully conform to:
1. The EU's RoHS 2.0(Directive 2011/65/EU & EU 2015/863 )2. SVHC(Substance of Very High Concern) of EU directive of the Regulation(EC) No.1907/2006(REACH).
PRODUCT PICTURES


DRAWING



MAIN CUSTOMER

FACTORY VIEW


SHIPPING & PAYMENT
--------------------------------------------------------------------
1. FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to- Door.
2. By Air or by Sea for Mass production.
2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.
3.Delivery Time: 3-7 days for samples; 10-30 days for Mass production.
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.3.Delivery Time: 3-7 days for samples; 10-30 days for Mass production.