

1. Enhanced Output Power: Unleash unparalleled performance with our Pneumatic Rock Drill, designed to deliver top-tier power and exceptional efficiency for the most demanding tasks.
2. Swift Rock Drilling Speed: Achieve superior productivity with faster penetration rates that maximize efficiency and reduce time spent on-site.
3. Superior Lubrication System: Our innovative lubrication system ensures the longevity of moving parts by minimizing wear and tear, allowing for extended operation and reliability.
4. Optimized Machine Design: Experience the perfect synergy of impact energy and frequency, crafting this machine into the quintessential tool for effective and efficient rock drilling.
5. Advanced Gas and Water Linkage: Benefit from features such as quick gas-leg return and air pressure adjustments, all engineered to enhance operational efficiency and streamline your workflow.
6. User-Centric Control: Enjoy a new level of convenience with a centralized control handle located with the back head, complemented by a muffler cover that reduces noise and allows for adjustable discharge direction, improving working conditions on the field.
Application Areas:
Ideal for various demanding environments including mining, traffic tunnels, water conservancy construction, quarries, and beyond, ensuring versatility and adaptability.
SPECIFICATIONS for YT series pneumatic rock drilling machine with air leg | ||||
Model | TY24C | YT27 | YT28 | YT29A |
Weight | 24kg | 27kg | 26kg | 26.5kg |
Length | 628mm | 668mm | 661mm | 659mm |
Air pressure | 0.4-0.63Mpa | 0.4-0.63Mpa | 0.4-0.63Mpa | 0.4-0.63Mpa |
Impact frequency | <=37hz | <=39hz | >=37HZ | >=39HZ |
Air consumption | <=80L/s | <=86L/s | <=81L/s | <=88L/s |
Impact energy | >=65J | >=75J | >=70J | >=78J |
Cylinder*stroke | 76mm*60mm | 80mm*60mm | 80mm*60mm | 82mm*60mm |
Air pipe diameter | 25mm | 19mm | 25mm | 25mm |
Shank dimension | 22*108mm | 22*108mm | 22*108mm | 22*108mm |
Drilling depth | 5M | 5M | 5M | 5M |
Bit diameter | 34-42mm | 34-45mm | 34-42mm | 34-45mm |
Pre-Operational Checklist: Preparing Your Rock Drill for Optimal Performance
1. Begin by thoroughly inspecting all components, including the rock drill, bracket, or rock drill cart, ensuring they are intact and generously lubricated. Verify that the wind and water pathways are unobstructed and that connection joints are firmly secured for seamless operation.
2. Conduct a meticulous inspection of the roof area near the work site, identifying and addressing any live or loose rocks. Resolve any potential hazards for a safe and secure drilling environment.
3. Confirm that the working surface is level to prevent any slippage or displacement during the drilling process, ensuring a stable operation.
4. It is imperative to drill with water to prevent dry drilling. Initiate the process with water, followed by wind, and reverse the sequence when ceasing operation. Start at a low speed, then transition to full speed once the desired depth is reached for efficiency and precision.
5. Operators must avoid wearing gloves during the operation to maintain precise control and safety.
6. Maintain proper posture and positioning when utilizing the air leg. Refrain from using body pressure and ensure not to stand directly in front of the rock drill to avert injury from potential breakage of brazing rods.
7. Should you encounter abnormal sounds or unexpected water discharge, immediately halt the machine. Perform a detailed inspection to diagnose and address the issue before resuming operations.
8. When retracting the rock drill or exchanging the brazing rod, proceed with the drill slowly and exercise caution regarding the position of the brazing rod to ensure safety and precision.



Discover Our Price Advantage
At Xianghe Kaituo Mining Machinery Co., Ltd., we pride ourselves on being a dynamic industrial and trade enterprise. Benefit from our direct-from-factory pricing, ensuring unbeatable value!Delivery Timeframe: What to Expect
As the manufacturer of the Pneumatic Rock Drill for Heavy Duty Applications in Rock Drilling, we prioritize swift production upon receiving order confirmation. For in-stock items, anticipate delivery within a brisk 15-day period. For larger, more complex orders, delivery may take up to 30 days.
Accepted Payment Terms
We primarily accept T/T or D/P. For T/T transactions, a 30% deposit is required initially. The remaining 70% is due before we dispatch your order, ensuring a smooth and secure transaction.
Price Validity Period
Our factory pricing is renowned for its stability throughout the year. However, adjustments may occur in response to significant fluctuations in the U.S. dollar exchange rate or when rising labor and raw material costs necessitate manufacturer price changes.
Logistics and Transportation Options
Explore Our Three Main Modes of Freight Transport 1. Sea Freight: 80% of our shipments set sail to major continents like Africa, South America, and the Middle East, ensuring efficient global reach. 2. For our landlocked neighbors, road or rail transport is available, facilitating seamless deliveries.3. In urgent situations involving light spare parts, air transportation is your quickest option, meeting your time-sensitive needs.