DP1000
1 Year
Horizontal
Thermoplastic
Automatic
CE, ISO9001:2008
Engineers Available to Service Machinery Overseas
Big Size Plastic Parts
Provided
New
Hydraulic
Servo
Car Bumper Making Machine
Egypt, Turkey, United Kingdom, United States, Fran
1037 G/S
2600 mm
112 Kw
350 mm
Provided
PP, PC, ABS, Pet, PVC, PPR, EVA, HDPE, PE, LDPE
210 Kn
Powerjet
Fixed in The Container with Wire Rope, Suitable Fo
CE standard
Guangdong, China
8477101090
Product Description



DESCRIPTION | UNIT | DP1000-S6 | |
CLAMPING UNIT | Clamping force | KN | 10000 |
Opening stroke | mm | 2100/1300 | |
Max.daylight | mm | 2600 | |
Space between bars | mm | 1300*1100 | |
Max.mold height | mm | 1300 | |
Min.mold height | mm | 500 | |
Ejector stroke | mm | 350 | |
Ejector force | KN | 210 | |
INJECTION UNIT | Screw diameter | mm | 100 |
Screw L/D Ratio | L/D | 24.2 | |
Injection Pressure | MPa | 194 | |
Shot volume | cm3 | 4516 | |
Shot weight (ps) | g | 4109 | |
oz | 145 | ||
Injection rate | g/s | 1311 | |
Plasticizing capacity | g/s | 108 | |
Screw stroke | mm | 620 | |
Screw speed | rpm | 115 | |
POWER UNIT | Hydraulic system Pressure | MPa | 17.5 |
Pump motor power | KW | 52+60 | |
Heater power | KW | 61 | |
GENERAL | Oil tank capacity | L | 1250 |
Machine weight | T | 44 | |
Machine dimensions (L*W*H) | m | 9.5*3.4*2.9 |






Q1: Are you a manufacturer or trading company?
A1: We are a factory for plastic machines. Over 24 Years Experience In Manufacturing Injection Molding Machine And Blow Molding Machine.
Q2: Delivery time
A2: Normally Machine Delivery from the factory in 0-60 days after receiving the down payment. (During Chinese Public Holidays like National Day or Chinese New Year, the delivery time should be 10-30days longer accordingly).
Q3: Where is your factory located?
A3: Our factory is located in No.5 Chuangxin Xi Road, Leping Town, Sanshui District, Foshan City, Guangdong Province, China. 1h drive from Guangzhou to our factory. Welcome to visit our factory.
A1: We are a factory for plastic machines. Over 24 Years Experience In Manufacturing Injection Molding Machine And Blow Molding Machine.
Q2: Delivery time
A2: Normally Machine Delivery from the factory in 0-60 days after receiving the down payment. (During Chinese Public Holidays like National Day or Chinese New Year, the delivery time should be 10-30days longer accordingly).
Q3: Where is your factory located?
A3: Our factory is located in No.5 Chuangxin Xi Road, Leping Town, Sanshui District, Foshan City, Guangdong Province, China. 1h drive from Guangzhou to our factory. Welcome to visit our factory.