White Interior Paint Concrete Wall Acrylic Polyurethane Topcoat/Smooth Film/Water Resistance

Price $3.49 Compare
Min Order 5000 kg
Shipping From Shandong, China
Popularity 233 people viewed
Quantity
+-
 

Shandong Haiheng Holding Group Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
Acrylic Polyurethane-white. in. 2
White
Liquid
Acrylic
Spray/Roll/Brush
Finish Coat
Air Drying
ISO9001, ISO9000
Steel
Resin + Pigment + Solvent + Additive
Conversion Type
a:B=5:1
1year
23ºC, 4h
Two-Component Epoxy Paint
≥60s
≤35μm
≥60%
No Abnormalities
1h
24h
Level 2 Pass
Level Hb Pass
Ayrood
Iron Drum
Main Paint 20KG + Curing Agent 4KG
Jining, Shandong, China
Product Description
White Interior Paint Concrete Wall Acrylic Polyurethane Topcoat
/Smooth Film/Water Resistance
 
We use paint packaging cans imported from Germany, transport will be free for you to strengthen the packaging, to ensure that the product is transported to your hands is the most perfect state, and our packaging design is exquisite, excellent workmanship, the quality of the product itself is excellent, so the products are exported to dozens of countries and regions.
 
Design Usage

1. Interior steel component;
2. Interior steel products;
3. Indoor instrumentation and other workpieces, etc.

Design Feature

1. Air drying;
2. Uniform and beautiful color;
3. Strong adhesion;
4. Good resistance to water and oil;
5. Excellent physical and chemical properties.

Executive Standard

A variety of regular colors, but not white.

Execution Conditions

· Surface Treatment
 
1. Steel sandblasting to Sa2.5 level, or manual rust removal St3 level, rough surface 40-70μm, keep the substrate surface clean and dry.
  2. After reaching the above rust removal standards, the primer coating should be completed within 4h. Surfaces that fail to be primed in time should be resurfaced.


· Humidity & Temperature
 
The substrate temperature is 0 to 50 ° C, and must be 3 ° C above the dew point, and the relative humidity is not greater than 85%.

Safety Matters

1. Proper ventilation of the construction site;
2. Fireworks are strictly prohibited in the construction site and adjacent areas;
3. Use explosion-proof electrical equipment;
4. Metal impact is strictly prohibited;
5. Prevent static accumulation;
6. Wear necessary protective equipment;
7. Avoid inhaling paint mist, avoid skin contact with paint and thinner, etc;
8. If the eyes are accidentally splashed with paint, wash with plenty of water and seek medical attention;
9. Properly dispose of empty paint drums and remaining paint to avoid environmental pollution;
10. Take all other necessary safety and fire control measures according to the specific situation on the scene.

Company Profile

Packaging & Shipping

Certifications

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA