MODEL | U1-300 | U1-400 | U1-450 |
Speed | 18000 BPH | 24000 BPH | 30000 BPH |
Power | 14KW | 18KW | 20 KW |
Machine Size (mm) | 2200L*2300W*2000H | 2200L*2500W*2000H | 2500L*2800W*2000H |
Container Material | PET , PP , PE ,HDPE , Glass , Metal etc. | ||
Container Diameter | φ30-200 mm | ||
Container Height | 100-500 mm (can be custimized) | ||
Label Roll Inner Diameter | 6 inches(152mm) | ||
Label Height | 20-250mm | ||
Voltage | AC 3φ 380V/50HZ | ||
Air Consumption | 3-6 kg/cm² |


1.heavy machinebe packed
in wooden case
2. machines be packed in thick plastic films
Automatic 5 Gallon 18.9L Bottle Barrel Water Washing Filling Capping Machine
Shanghai






Q: How long is your delivery cycle after you order the machinery? A: Generally it is 40 working days.
Q: Do you have a relevant after-sales system? A: We have a Perfect after-sales system. 1: 12 months warranty. 2: Many-to-one service, we will solve basic problems through phone, email, whatsapp, WeChat and video calls. The operation manual will be sent with the machine or via e-mail. 3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine.
Q: If I want to buy a machine, what information do I need to tell you? A: 1: What liquid do you want to fill? 2: What is the capacity and height of the bottle? 3: What is the output in one hour? 4: Related water quality analysis reports, etc. 5: Required mechanical voltage
Q:How to ensure that you deliver goods on time and ensure the safety of my funds? 1:We guarantee the on-time delivery and quality of the equipment you purchase through the credit insurance service. 2:With the letter of credit, you can easily lock in the delivery time. 3:After visiting the factory/video watching the factory, you can ensure the authenticity of our bank account.
Q:How do you ensure the quality of the machine? 1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years. 2:Before the machine is assembled, each part is inspected by the inspector. 3:Assemble machines, all with masters with more than 5 years of work experience to operate. 4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line to test its stability.
